Charging stations in Merkez

66 public charging points in Merkez, Kütahya, across 14 networks. The fastest delivers 400 kW.

Charging points
66
DC fast
31
Max power
400kW
Networks
14

Charging infrastructure in Merkez: the numbers

Merkez ranks 1st among the 13 districts of Kütahya by number of charging points; its share of the province's points is 62%. 31 points are DC fast (47%); across Kütahya the share is 39%.

Highest power 400 kW: Erka Çarşı, ZES. Average power is 86 kW; the median point is 60 kW. 14 networks: ZES (30), Trugo (8), Lumicle (5) and others. The median of known DC tariffs in the district is 14.98 ₺/kWh; the Kütahya median is 14.98 ₺/kWh. 2 points are listed as open 24/7.

Rank in Kütahya
1 / 13
DC share
47%

Cheapest DC charging points in Merkez

known DC tariffs

Tariffs are the values published by the networks and may change; check them in the network's app before you start charging.

Charging points

1–60 of 66

Charging networks in Merkez

Other districts in Kütahya

Frequently asked questions

How many charging stations are there in Merkez?

In Merkez (Kütahya), there are 66 public EV charging points; 31 of them (47%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.

Which charging network has the most stations in Merkez?

The most widespread charging network in Merkez (Kütahya) is ZES, with 30 points. It is followed by Trugo (8) and Lumicle (5). In total, stations from 14 different networks are present; payment and starting a charge are done in each network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.

What is the fastest charging station in Merkez?

The highest recorded power in Merkez (Kütahya) is 400 kW, offered by Erka Çarşı (ZES, Merkez). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.

How long does it take to charge an electric car in Merkez?

The most powerful DC fast charging point in Merkez (Kütahya) is Erka Çarşı (ZES, Merkez) with 400 kW; approximate 10% to 80% times there: Togg T10X 35 min, Tesla Model Y Long Range 20 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The median power of the 31 DC points in the area is 150 kW; at this power the Togg T10X charges in about 35 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.

Where can the Togg T10X charge at full speed in Merkez?

In Merkez (Kütahya), 16 DC fast charging points deliver 150 kW or more; the Togg T10X charges at its peak power at these points, and 10% to 80% takes about 35 min. Among them, the lowest known DC tariff is 14.90 ₺/kWh at Nomad, PO, Kütahya (Eşarj). Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.

Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy