2 public charging points in Dumlupınar, Kütahya, on the ZES network. The fastest delivers 22 kW.
Dumlupınar ranks 10th among the 13 districts of Kütahya by number of charging points; its share of the province's points is 2%. There is no DC fast-charging point in the district; the nearest DC is Kadoil, Haydaroğulları, Afyonkarahisar, 20 km away (Eşarj, 30 kW, Sinanpaşa).
The district's most powerful point is Kütahya Dumlupınar Belediyesi at 22 kW (ZES).
Hamamboğazı Tesisleri Uşak
16 km · ZES · Banaz · Type 2
22kW
Uşak Hamam Boğazı Tesisleri
16 km · ZES · Banaz · Type 2
22kW
Kadoil, Haydaroğulları, Afyonkarahisar
20 km · Eşarj · Sinanpaşa · CCS2
30kW
Gülce Petrol
23 km · Rst ChargePoint · Banaz · CCS2
120kW
Banaz Petrol
23 km · ZES · Banaz
Sinanpaşa Belediyesi
26 km · ZES · Sinanpaşa
In Dumlupınar (Kütahya), there are 2 public EV charging points; only AC charging is available, with no DC fast charging points. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.
The most widespread charging network in Dumlupınar (Kütahya) is ZES, with 2 points. All points here belong to this network; payment and starting a charge are done in the network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.
The highest recorded power in Dumlupınar (Kütahya) is 22 kW, offered by Kütahya Dumlupınar Belediyesi (ZES, Dumlupınar). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.
There are no DC fast charging points in Dumlupınar (Kütahya); the 2 points here provide AC charging. The nearest DC fast charger is about 20 km as the crow flies from the centre of the district's points: Kadoil, Haydaroğulları, Afyonkarahisar in the Sinanpaşa district (30 kW). On a long trip, you can plan your break around this point.
Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected
We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy