DPU Kampüs 02
Eee Eskişehir Endüstriyel Enerji Elektrik Üretim A.Ş. · Enne Mahallesi Tavşanlı Yolu 10. Km Merkez / KÜTAHYA
- Max power
- 120kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 120kW
CCS2×2
DC
Price
Eee Eskişehir Endüstriyel Enerji Elektrik Üretim A.Ş. doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Nearby: Café · Parking
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 120 kW, it ranks 17th by power among the 62 points with known power in Merkez district. The nearest other DC point is at the same address: DPU Kampüs 01 (Eee Eskişehir Endüstriyel Enerji Elektrik Üretim A.Ş., 60 kW). There are 17 more DC points within 10 km. Nearby (3 km): 3 other points and 2 networks.
The Eee Eskişehir Endüstriyel Enerji Elektrik Üretim A.Ş. network has 5 points in Kütahya province; this one is among those in the Kütahya area.
- Power rank in Merkez
- 17 / 62
- Nearest other DC
- at the same address
- 3 km radius
- 4 points · 2 networks
Charging time here from 10% to 80% (120 kW DC)
- Togg T10X
- ≈ 40 min
- Tesla Model Y Long Range
- ≈ 35 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Eee Eskişehir Endüstriyel Enerji Elektrik Üretim A.Ş. app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at DPU Kampüs 02?
Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does DPU Kampüs 02 have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 120 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
DPU Kampüs 01
0 m · Eee Eskişehir Endüstriyel Enerji Elektrik Üretim A.Ş. · CCS2
60kW
Dumlupınar Üniversitesi Evliya Çelebi Yerleşkesi
344 m · Trugo · CCS2
180kW
Dumlupınar Üniversitesi
2.7 km · Trugo · CCS2
180kW
Özçınarlar Petrol Kütahya
3.9 km · ZES · Type 2
22kW
Kütahya Ticaret Borsası
5.1 km · Trugo · CCS2
180kW
Özçınarlar Petrol - 2
5.3 km · ZES · Type 2
22kW
Source: EPDK licence record (ŞRJ/12616) · Updated: 2 November 2026 at 17:35 · How the data is collected