LUMICLE KÜTAHYA BULVAR 60 kW DC
Lumicle · Lala Hüseyin Paşa, Adnan Menderes Blv., 43100 Kütahya Merkez/Kütahya, Kütahya
- Max power
- 60kW
- Connectors
- 1
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 60kW
CCS2×1
DC
Price
Lumicle doesn't publish a price for this point. The current tariff is shown in the network's own app. Lumicle website
Facility
- Located at: Fuel station
- Nearby: Shop
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 62 points with known power in Merkez district, it is 25th (60 kW). The nearest other DC point is 250 m away: TotalEnergies Kütahya Demir Akaryakıt (Otojet, 60 kW). There are 24 more DC points within 10 km. Within 3 km there are 20 other charging points and 8 different networks in total; you may need different networks' apps.
The Lumicle network has 5 points in Kütahya province; this one is among those in the Kütahya area.
- Power rank in Merkez
- 25 / 62
- Nearest other DC
- 250 m
- 3 km radius
- 21 points · 8 networks
Charging time here from 10% to 80% (60 kW DC)
- Togg T10X
- ≈ 1 h 5 min
- Tesla Model Y Long Range
- ≈ 55 min
- MG4 (64 kWh)
- ≈ 50 min
- BYD Atto 3
- ≈ 45 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Lumicle app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the LUMICLE KÜTAHYA BULVAR 60 kW DC charging station?
Approximate 10% to 80% times with the 60 kW DC socket: Togg T10X 1 h 5 min, Tesla Model Y Long Range 55 min, MG4 (64 kWh) 50 min and BYD Atto 3 45 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 60 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does LUMICLE KÜTAHYA BULVAR 60 kW DC have?
This point has 1 recorded socket: CCS2 (DC, 60 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
TotalEnergies Kütahya Demir Akaryakıt
237 m · Otojet · CCS2
60kW
Otojet - Kütahya Demir Akaryakıt
1.2 km · Otojet · CCS2
60kW
Huzur Termal Apart Otel
1.3 km · ZES · Type 2
22kW
Seyitömer Belediyesi
1.6 km · ZES · Type 2
22kW
Hilton Garden Inn Kütahya
1.6 km · ZES · Type 2 · CCS2
60kW
Oepsaş Kütahya
1.8 km · ZES · Type 2
22kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
