Antoto Renault Plaza Şarj İstasyonu - 1
Petroo · Sarısu Mahallesi 121 Sokağı No:8 Konyaaltı / ANTALYA
- Max power
- 90kW
- Connectors
- 4
- Current
- DC / AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 90kW
CCS2×2
DC
- 22kW
Type 2×1
AC
- 7kW
Type 2×1
AC
Price
Petroo doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Located at: Shopping mall
- Nearby: Toilet · Café · Restaurant · Shop
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 55 points with known power in Konyaaltı district, it is 19th (90 kW). The nearest other DC point is at the same address: Türk Telekom Antalya Bölge Müdürlüğü (E4 Şarj, 60 kW). There are 142 more DC points within 10 km. Within 3 km there are 73 other charging points and 29 different networks in total.
The Petroo network has 33 points in Antalya province; this one is among those in the Konyaaltı area.
- Power rank in Konyaaltı
- 19 / 55
- Nearest other DC
- at the same address
- 3 km radius
- 74 points · 29 networks
Charging time here from 10% to 80% (90 kW DC)
- Togg T10X
- ≈ 50 min
- Tesla Model Y Long Range
- ≈ 45 min
- MG4 (64 kWh)
- ≈ 35 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Petroo app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Antoto Renault Plaza Şarj İstasyonu - 1 charging station?
Approximate 10% to 80% times with the 90 kW DC socket: Togg T10X 50 min, Tesla Model Y Long Range 45 min, MG4 (64 kWh) 35 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 90 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Antoto Renault Plaza Şarj İstasyonu - 1 have?
This point has 4 recorded sockets: 2 × CCS2 (DC, 90 kW), Type 2 (AC, 7 kW) and Type 2 (AC, 22 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Türk Telekom Antalya Bölge Müdürlüğü
19 m · E4 Şarj · CCS2 · Type 2
60kW
Opel Balaban Otomotiv, Antalya
188 m · Eşarj · CCS2
90kW
Alvin Antalya - Volkswagen
215 m · D-Charge · CCS2 · Type 2
180kW
Antalya Belediyesi Güllük Katlı Otopark Şarj İstasyonu
385 m · Petroo · Type 2
22kW
Sky Kamer Hotel Antalya
393 m · ZES · Type 2
22kW
Antalya Muratpaşa Belediyesi Otopark Alanı
638 m · GEL DOL
Source: EPDK licence record (ŞRJ/2035) · Updated: 2 November 2026 at 17:35 · How the data is collected
