Türk Telekom Antalya Bölge Müdürlüğü
E4 Şarj · Deniz Mahallesi Güllük Caddesi No:7 Muratpaşa / ANTALYA
- Max power
- 60kW
- Connectors
- 4
- Current
- DC / AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 60kW
CCS2×2
DC
- 22kW
Type 2×2
AC
Price
E4 Şarj doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Located at: Shopping mall
- Nearby: Toilet · Café · Restaurant · Shop
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 133 points with known power in Muratpaşa district, it is 49th (60 kW). The nearest other DC point is at the same address: Antoto Renault Plaza Şarj İstasyonu - 1 (Petroo, 90 kW). There are 142 more DC points within 10 km. Within 3 km there are 74 other charging points and 29 different networks in total; if one is busy, an alternative is easy to find nearby.
The E4 Şarj network has 2 points in Antalya province; this one is among those in the Muratpaşa area.
- Power rank in Muratpaşa
- 49 / 133
- Nearest other DC
- at the same address
- 3 km radius
- 75 points · 29 networks
Charging time here from 10% to 80% (60 kW DC)
- Togg T10X
- ≈ 1 h 5 min
- Tesla Model Y Long Range
- ≈ 55 min
- MG4 (64 kWh)
- ≈ 50 min
- BYD Atto 3
- ≈ 45 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the E4 Şarj app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Türk Telekom Antalya Bölge Müdürlüğü charging station?
Approximate 10% to 80% times with the 60 kW DC socket: Togg T10X 1 h 5 min, Tesla Model Y Long Range 55 min, MG4 (64 kWh) 50 min and BYD Atto 3 45 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 60 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Türk Telekom Antalya Bölge Müdürlüğü have?
This point has 4 recorded sockets: 2 × CCS2 (DC, 60 kW) and 2 × Type 2 (AC, 22 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Antoto Renault Plaza Şarj İstasyonu - 1
19 m · Petroo · CCS2 · Type 2
90kW
Opel Balaban Otomotiv, Antalya
169 m · Eşarj · CCS2
90kW
Alvin Antalya - Volkswagen
196 m · D-Charge · CCS2 · Type 2
180kW
Antalya Belediyesi Güllük Katlı Otopark Şarj İstasyonu
378 m · Petroo · Type 2
22kW
Sky Kamer Hotel Antalya
393 m · ZES · Type 2
22kW
Antalya Muratpaşa Belediyesi Otopark Alanı
633 m · GEL DOL
Source: EPDK licence record (ŞRJ/13516) · Updated: 2 November 2026 at 17:35 · How the data is collected
