Antalya Belediyesi Güllük Katlı Otopark Şarj İstasyonu
Petroo · Kışla Mahallesi Muratpaşa / ANTALYA
- Max power
- 22kW
- Connectors
- 3
- Current
- AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 22kW
Type 2×3
AC
Price
Petroo doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Nearby: Café · Restaurant · Shop
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 22 kW, it ranks 66th by power among the 133 points with known power in Muratpaşa district. This point offers AC (slow) charging; the nearest DC fast charger is 350 m away: Opel Balaban Otomotiv, Antalya (Eşarj, 90 kW). Nearby (3 km): 76 other points and 29 networks; if one is busy, an alternative is easy to find nearby.
The Petroo network has 33 points in Antalya province; this one is among those in the Muratpaşa area.
- Power rank in Muratpaşa
- 66 / 133
- Nearest DC
- 350 m
- 3 km radius
- 77 points · 29 networks
Charging time here from 20% to 80% (AC up to 11 kW)
- Togg T10X
- ≈ 5.5 hours
- Tesla Model Y Long Range
- ≈ 4.5 hours
- MG4 (64 kWh)
- ≈ 4 hours
- BYD Atto 3
- ≈ 3.5 hours
AC charging suits long stays (work, shopping centre, overnight). Calculated assuming the vehicle accepts AC up to 11 kW; the value is approximate.
How to charge
You start charging with the Petroo app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many hours does charging take at Antalya Belediyesi Güllük Katlı Otopark Şarj İstasyonu?
This point provides 22 kW AC charging; if your car accepts up to 11 kW AC, approximate 20% to 80% times are: Togg T10X 5.5 hours, Tesla Model Y Long Range 4.5 hours, MG4 (64 kWh) 4 hours and BYD Atto 3 3.5 hours. AC charging suits long stays such as work, shopping or overnight; for a quick stop on the road, check the nearest DC fast charging point on this page. Values are estimates.
Which sockets does Antalya Belediyesi Güllük Katlı Otopark Şarj İstasyonu have?
This point has 3 recorded sockets: 3 × Type 2 (AC, 22 kW). There is no DC fast charging; the point provides AC charging. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Sky Kamer Hotel Antalya
161 m · ZES · Type 2
22kW
Opel Balaban Otomotiv, Antalya
355 m · Eşarj · CCS2
90kW
Alvin Antalya - Volkswagen
360 m · D-Charge · CCS2 · Type 2
180kW
Türk Telekom Antalya Bölge Müdürlüğü
378 m · E4 Şarj · CCS2 · Type 2
60kW
CV-Charging- Khan Hotel 2x22 kW
383 m · Charging Vehicles CV · Type 2
22kW
Antoto Renault Plaza Şarj İstasyonu - 1
385 m · Petroo · CCS2 · Type 2
90kW
Source: EPDK licence record (ŞRJ/8232) · Updated: 2 November 2026 at 17:35 · How the data is collected
