2 public charging points in Perşembe, Ordu, across 2 networks. The fastest delivers 120 kW.
Perşembe ranks 5th among the 10 districts of Ordu by number of charging points; its share of the province's points is 2%. 1 point is DC fast (50%).
Highest power 120 kW: Anafor Otel, Green Science. 2 networks: Green Science (1), Voltrun (1).
Kozza Restaurant
15 km · Voltrun · Altınordu · Type 2
22kW
Maviay Restaurant VE Akaryakıt
15 km · Voltrun · Fatsa · CCS2
120kW
Mavi Ay Otel
15 km · ZES · Fatsa · Type 2
22kW
Waveside Hotel
15 km · Trugo · Altınordu · Type 2
22kW
TÜVTÜRK Araç Muayene İstasyonu-Merkez/ORDU
16 km · Tüvturk · Altınordu · Type 2
22kW
Çamlıköşk Sosyal Tesisleri
16 km · Trugo · Altınordu · CCS2
180kW
In Perşembe (Ordu), there are 2 public EV charging points; 1 of them (50%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.
The most widespread charging network in Perşembe (Ordu) is Green Science, with 1 point. It is followed by Voltrun (1). In total, stations from 2 different networks are present; payment and starting a charge are done in each network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.
The highest recorded power in Perşembe (Ordu) is 120 kW, offered by Anafor Otel (Green Science, Perşembe). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.
The most powerful DC fast charging point in Perşembe (Ordu) is Anafor Otel (Green Science, Perşembe) with 120 kW; approximate 10% to 80% times there: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.
In Perşembe (Ordu), there is no DC point with 150 kW or more; the most powerful point offers 120 kW, where the Togg T10X charges from 10% to 80% in about 40 min. Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.
Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected
We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy