Charging stations in Kumru

2 public charging points in Kumru, Ordu, on the GEL DOL network. The fastest delivers 22 kW.

Charging points
2
Max power
22kW
Networks
1

Charging infrastructure in Kumru: the numbers

Kumru ranks 7th among the 10 districts of Ordu by number of charging points; its share of the province's points is 2%. There is no DC fast-charging point in the district; the nearest DC is Ordu Akkuş Devlet Hastanesi, 22 km away (Trugo, 180 kW, Akkuş).

The district's most powerful point is Kumru Belediyesi Otoparkı at 22 kW (GEL DOL).

Rank in Ordu
7 / 10
DC in the district
none

Charging points

2 charging points

Nearest charging points around Kumru

straight-line distance to the district centre

Charging networks in Kumru

Other districts in Ordu

Frequently asked questions

How many charging stations are there in Kumru?

In Kumru (Ordu), there are 2 public EV charging points; only AC charging is available, with no DC fast charging points. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.

Which charging network has the most stations in Kumru?

The most widespread charging network in Kumru (Ordu) is GEL DOL, with 2 points. All points here belong to this network; payment and starting a charge are done in the network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.

What is the fastest charging station in Kumru?

The highest recorded power in Kumru (Ordu) is 22 kW, offered by Kumru Belediyesi Otoparkı (GEL DOL, Kumru). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.

Is there DC fast charging near Kumru?

There are no DC fast charging points in Kumru (Ordu); the 2 points here provide AC charging. The nearest DC fast charger is about 22 km as the crow flies from the centre of the district's points: Ordu Akkuş Devlet Hastanesi in the Akkuş district (180 kW). On a long trip, you can plan your break around this point.

Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy