1 public charging point in Akkuş, Ordu, on the Trugo network. The fastest delivers 180 kW.
Akkuş ranks 9th among the 10 districts of Ordu by number of charging points; its share of the province's points is 1%. 1 point is DC fast (100%).
Highest power 180 kW: Ordu Akkuş Devlet Hastanesi, Trugo.
Kumru Belediyesi Otoparkı 22 kW AC
22 km · GEL DOL · Kumru · Type 2
22kW
Kumru Belediyesi Otoparkı
22 km · GEL DOL · Kumru · Type 2
22kW
ŞEN Orman Ürünleri Niksar
24 km · İ-şarj · Niksar · CCS2 · Type 2
60kW
ŞEN Orman Ürünleri
24 km · Tora · Niksar
Niksar Şen Orman Ürünleri
24 km · Trugo · Niksar · CCS2
180kW
Şahinler, Niksar
25 km · OtoPriz · Niksar · CCS2
180kW
In Akkuş (Ordu), there is 1 public EV charging point; 1 of them (100%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.
The most widespread charging network in Akkuş (Ordu) is Trugo, with 1 point. All points here belong to this network; payment and starting a charge are done in the network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.
The highest recorded power in Akkuş (Ordu) is 180 kW, offered by Ordu Akkuş Devlet Hastanesi (Trugo, Akkuş). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.
The most powerful DC fast charging point in Akkuş (Ordu) is Ordu Akkuş Devlet Hastanesi (Trugo, Akkuş) with 180 kW; approximate 10% to 80% times there: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.
In Akkuş (Ordu), 1 DC fast charging point delivers 150 kW or more; the Togg T10X charges at its peak power at these points, and 10% to 80% takes about 35 min. Among them, the lowest known DC tariff is 14.98 ₺/kWh at Ordu Akkuş Devlet Hastanesi (Trugo). Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.
Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected