Edirne Ulusoy Dinlenme Tesisleri
WAT Mobilite · Kapıkule Yolu Üzeri Mahallesi Merkez / EDİRNE
- Max power
- 150kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Customer service
0850 755 98 98 · 7/24
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 150kW
CCS2×2
HPC14.49 ₺/kWh
Price
- DC
- 14.49 ₺/kWh
WAT Mobilite standard tariff; prices may vary by location. Tariff source
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 150 kW, it ranks 16th by power among the 51 points with known power in Merkez district. The nearest other DC point is at the same address: B-Charge - Londra Camping (B-Charge, 180 kW). There are 5 more DC points within 10 km. Nearby (3 km): 3 other points and 4 networks.
The DC tariff of 14.49 ₺/kWh is 3% below the median of the 39 known DC tariffs in Edirne (14.98 ₺/kWh). The WAT Mobilite network has 7 points in Edirne province; this one is among those in the Edirne area.
- Power rank in Merkez
- 16 / 51
- Nearest other DC
- at the same address
- 3 km radius
- 4 points · 4 networks
- DC tariff
- 14.49 ₺/kWh
Charging time here from 10% to 80% (150 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 30 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the WAT Mobilite app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Edirne Ulusoy Dinlenme Tesisleri?
Approximate 10% to 80% times with the 150 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 30 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 150 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Edirne Ulusoy Dinlenme Tesisleri?
According to the tariff published by the WAT Mobilite network, prices at this point are: DC 14.49 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 900 ₺ at the DC tariff. Payment is made with the WAT Mobilite app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Edirne Ulusoy Dinlenme Tesisleri have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 150 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
B-Charge - Londra Camping
0 m · B-Charge · CCS2
180kW
Londra Inn Hotel
906 m · Trugo · CCS2
180kW
PO Edirne (Hasha Turizm)
906 m · 5 Şarj · CCS2
160kW
Londra Inn Hotel
3.8 km · ZES · CCS2
400kW
Petrol Ofisi - Kapıkule Yolu
4.8 km · e-POwer · Type 2
22kW
İstanbul Outlet Center Kapıkule
4.8 km · WAT Mobilite · CCS2 · Type 2
180kW
Source: EPDK licence record (ŞRJ/13015) · Updated: 2 November 2026 at 17:35 · How the data is collected
