Londra Inn Hotel
ZES · Kapıkule Yolu Üzeri 360/2
- Max power
- 400kW
- Connectors
- 6
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Enerji aktarımı bittikten sonra araç çekilmezse 15. dk'da 150 ₺, 30. dk'da 300 ₺, 45. dk'da 450 ₺, 60. dk'da 500 ₺ eklenir.source
With the ZES app you can also charge at
Solarşarj (ZES uygulamasındaki Roaming sekmesinden) · WAT Mobilite
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 400kW
CCS2×6
HPC16.49 ₺/kWh
Price
- HPC
- 16.49 ₺/kWh
ZES standard tariff; prices may vary by location. Tariff source
Facility
- Nearby: Shop · Parking
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
At 400 kW, the most powerful charging point among the 51 points with known power in Merkez district. The nearest other DC point is 950 m away: İstanbul Outlet Center Kapıkule (WAT Mobilite, 180 kW). There are 5 more DC points within 10 km. Nearby (3 km): 4 other points and 5 networks; if one is busy, an alternative is easy to find nearby.
The DC tariff of 16.49 ₺/kWh is 10% above the median of the 39 known DC tariffs in Edirne (14.98 ₺/kWh). The ZES network has 30 points in Edirne province; this one is among those in the Edirne area.
- Power rank in Merkez
- 1 / 51
- Nearest other DC
- 950 m
- 3 km radius
- 5 points · 5 networks
- DC tariff
- 16.49 ₺/kWh
Charging time here from 10% to 80% (400 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 20 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the ZES app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Londra Inn Hotel?
Approximate 10% to 80% times with the 400 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 20 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 400 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Londra Inn Hotel?
According to the tariff published by the ZES network, prices at this point are: DC 16.49 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 1,020 ₺ at the DC tariff. Payment is made with the ZES app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Londra Inn Hotel have?
This point has 6 recorded sockets: 6 × CCS2 (HPC, 400 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Petrol Ofisi - Kapıkule Yolu
941 m · e-POwer · Type 2
22kW
İstanbul Outlet Center Kapıkule
941 m · WAT Mobilite · CCS2 · Type 2
180kW
Londra Inn Hotel
2.9 km · Trugo · CCS2
180kW
PO Edirne (Hasha Turizm)
2.9 km · 5 Şarj · CCS2
160kW
GoldenEye Hotel & Casino
3.1 km · ZES · Type 2
22kW
B-Charge - Londra Camping
3.8 km · B-Charge · CCS2
180kW
Source: ZES + EPDK licence record · Updated: 19 October 2026 at 04:37 · How the data is collected
