İmes Organize Sanayi DC
Powerşarj · Çerkeşli OSB Mahallesi, Çerkeşli OSB, İMES 1 Bulvarı No : 2, 41455 Dilovası/Kocaeli , Kocaeli
- Max power
- 180kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 180kW
CCS2×2
HPC
Price
Powerşarj doesn't publish a price for this point. The current tariff is shown in the network's own app. Powerşarj website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 30 points with known power in Dilovası district, it is 3rd (180 kW). The nearest other DC point is 100 m away: İmes Organize Sanayi Bölgesi (Power Elektronik Sanayi VE Ticaret Limited Şirketi, 90 kW). There are 25 more DC points within 10 km. Within 3 km there are 15 other charging points and 5 different networks in total; if one is busy, an alternative is easy to find nearby.
The Powerşarj network has 18 points in Kocaeli province; this one is among those in the Dilovası area.
- Power rank in Dilovası
- 3 / 30
- Nearest other DC
- 100 m
- 3 km radius
- 16 points · 5 networks
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Powerşarj app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the İmes Organize Sanayi DC charging station?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does İmes Organize Sanayi DC have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
İmes Organize Sanayi DUO1
5 m · Powerşarj · Type 2
22kW
İmes Organize Sanayi AC-1
10 m · Powerşarj · Type 2
22kW
İmes Organize Sanayi AC-2
15 m · Powerşarj · Type 2
22kW
İmes OSB Mükemmelliyet Merkezi
106 m · Power Elektronik Sanayi VE Ticaret Limited Şirketi · Type 2
22kW
İmes Organize Sanayi Bölgesi
106 m · Power Elektronik Sanayi VE Ticaret Limited Şirketi · Type 2 · CCS2
90kW
İmes OSB Mükemmeliyet Merkezi
346 m · Powerşarj · Type 2
22kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
