İmes Organize Sanayi Bölgesi
Power Elektronik Sanayi VE Ticaret Limited Şirketi · Çerkeşli Osb Mahallesi No:2 Dilovası / KOCAELİ
- Max power
- 90kW
- Connectors
- 6
- Current
- AC / DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 90kW
CCS2×2
DC
- 22kW
Type 2×4
AC
Price
Power Elektronik Sanayi VE Ticaret Limited Şirketi doesn't publish a price for this point. The current tariff is shown in the network's own app.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 90 kW, it ranks 14th by power among the 30 points with known power in Dilovası district. The nearest other DC point is 100 m away: İmes Organize Sanayi DC (Powerşarj, 180 kW). There are 25 more DC points within 10 km. Nearby (3 km): 15 other points and 5 networks.
The Power Elektronik Sanayi VE Ticaret Limited Şirketi network has 5 points in Kocaeli province; this one is among those in the Dilovası area.
- Power rank in Dilovası
- 14 / 30
- Nearest other DC
- 100 m
- 3 km radius
- 16 points · 5 networks
Charging time here from 10% to 80% (90 kW DC)
- Togg T10X
- ≈ 50 min
- Tesla Model Y Long Range
- ≈ 45 min
- MG4 (64 kWh)
- ≈ 35 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Power Elektronik Sanayi VE Ticaret Limited Şirketi app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at İmes Organize Sanayi Bölgesi?
Approximate 10% to 80% times with the 90 kW DC socket: Togg T10X 50 min, Tesla Model Y Long Range 45 min, MG4 (64 kWh) 35 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 90 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does İmes Organize Sanayi Bölgesi have?
This point has 6 recorded sockets: 4 × Type 2 (AC, 22 kW) and 2 × CCS2 (DC, 90 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
İmes OSB Mükemmelliyet Merkezi
0 m · Power Elektronik Sanayi VE Ticaret Limited Şirketi · Type 2
22kW
İmes Organize Sanayi AC-2
94 m · Powerşarj · Type 2
22kW
İmes Organize Sanayi AC-1
98 m · Powerşarj · Type 2
22kW
İmes Organize Sanayi DUO1
102 m · Powerşarj · Type 2
22kW
İmes Organize Sanayi DC
106 m · Powerşarj · CCS2
180kW
İmes OSB Mükemmeliyet Merkezi
265 m · Powerşarj · Type 2
22kW
Source: EPDK licence record (ŞRJ/13029) · Updated: 2 November 2026 at 17:35 · How the data is collected