Sevindikli Kuzey OHT
OnCharge · Kutluca Mah. Kuzey Marmara Otoyolu, Sevindikli Kuzey OHT Servis Alanı
- Max power
- 180kW
- Connectors
- 2
- Current
- HPC
- Open
- 24/7
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 180kW
CCS2×2
HPC13.50 ₺/kWh
Price
- DC
- 13.50 ₺/kWh
OnCharge standard tariff; prices may vary by location. Tariff source
Facility
- Located at: Rest area
- Opening hours: Open 24/7
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 180 kW, it ranks 7th by power among the 31 points with known power in Körfez district. The nearest other DC point is 100 m away: Nokta Sevindikli İstanbul Yönü (Trugo, 180 kW). There are 7 more DC points within 10 km. Nearby (3 km): 5 other points and 2 networks.
The DC tariff of 13.50 ₺/kWh is 9% below the median of the 119 known DC tariffs in Kocaeli (14.90 ₺/kWh). The OnCharge network has 12 points in Kocaeli province; this one is among those in the Körfez area.
- Power rank in Körfez
- 7 / 31
- Nearest other DC
- 100 m
- 3 km radius
- 6 points · 2 networks
- DC tariff
- 13.50 ₺/kWh
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the OnCharge app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Sevindikli Kuzey OHT?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Sevindikli Kuzey OHT?
According to the tariff published by the OnCharge network, prices at this point are: DC 13.50 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 840 ₺ at the DC tariff. Payment is made with the OnCharge app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Sevindikli Kuzey OHT have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Is Sevindikli Kuzey OHT open 24/7?
Yes, according to the records Sevindikli Kuzey OHT is open 24/7; you can charge at night too. For points inside shopping malls, hotels or car parks, the venue's opening hours may also apply; before setting off, it's a good idea to check the point's live status in the OnCharge app.
Other points nearby
Nokta Sevindikli İstanbul Yönü
79 m · Trugo · CCS2
180kW
Sevindikli OHT Ankara Yönü
166 m · Trugo · CCS2
180kW
Sevindikli OHT İstanbul Yönü
166 m · Trugo · CCS2
180kW
Sevindikli Güney OHT
237 m · OnCharge · CCS2
180kW
Nokta Sevindikli Ankara Yönü
338 m · Trugo · CCS2
180kW
KMO Sevindikli OHT Kuzey DC-1, DC-2
3.9 km · Beefull · CCS2
180kW
Source: OnCharge + EPDK licence record · Updated: 21 August 2026 at 22:03 · How the data is collected
