KMO Sevindikli OHT Kuzey DC-1, DC-2
Beefull · Sevindikli Mahallesi Kmo Kutluca 0-7 Caddesi Kmo Kutluca 0-7 Sevindikli Körfez / KOCAELİ
- Max power
- 180kW
- Connectors
- 4
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
AC: ilk 60 dk ücretsiz; sonra 150 ₺, 120. dk 300 ₺, 180. dk 450 ₺, 240. dk 500 ₺. DC: ilk 15 dk ücretsiz; sonra 150 ₺, 30. dk 300 ₺, 45. dk 450 ₺, 60. dk 600 ₺.source
With the Beefull app you can also charge at
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 180kW
CCS2×4
HPC
Price
Beefull doesn't publish a price for this point. The current tariff is shown in the network's own app. Beefull website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 31 points with known power in Körfez district, it is 7th (180 kW). The nearest other DC point is at the same address: KMO Sevindikli OHT Güney DC-1, DC-2 (Beefull, 180 kW). There are 7 more DC points within 10 km. The Beefull network has 4 points in Kocaeli province; this one is among those in the Körfez area.
- Power rank in Körfez
- 7 / 31
- Nearest other DC
- at the same address
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Beefull app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the KMO Sevindikli OHT Kuzey DC-1, DC-2 charging station?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does KMO Sevindikli OHT Kuzey DC-1, DC-2 have?
This point has 4 recorded sockets: 4 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
KMO Sevindikli OHT Güney DC-1, DC-2
0 m · Beefull · CCS2
180kW
Nokta Sevindikli İstanbul Yönü
3.9 km · Trugo · CCS2
180kW
Sevindikli Kuzey OHT
3.9 km · OnCharge · CCS2
180kW
Sevindikli OHT Ankara Yönü
4.1 km · Trugo · CCS2
180kW
Sevindikli OHT İstanbul Yönü
4.1 km · Trugo · CCS2
180kW
Sevindikli Güney OHT
4.2 km · OnCharge · CCS2
180kW
Source: EPDK licence record (ŞRJ/11449) · Updated: 2 November 2026 at 17:35 · How the data is collected
