Bilişim Vadisi Doğu OHT
OnCharge · Dilovası Batı Şubesi Demirciler Mah. Köprü Sok. No:51
- Max power
- 22kW
- Connectors
- 1
- Current
- AC
- Open
- 24/7
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 22kW
Type 2×1
AC9.99 ₺/kWh
Price
- AC
- 9.99 ₺/kWh
OnCharge standard tariff; prices may vary by location. Tariff source
Facility
- Located at: Rest area
- Opening hours: Open 24/7
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 30 points with known power in Dilovası district, it is 16th (22 kW). This point offers AC (slow) charging; the nearest DC fast charger is 2.0 km away: DOSTEL MAKİNA 80kW (Powerşarj, 80 kW). Within 3 km there are 5 other charging points and 2 different networks in total.
The OnCharge network has 12 points in Kocaeli province; this one is among those in the Dilovası area.
- Power rank in Dilovası
- 16 / 30
- Nearest DC
- 2.0 km
- 3 km radius
- 6 points · 2 networks
Charging time here from 20% to 80% (AC up to 11 kW)
- Togg T10X
- ≈ 5.5 hours
- Tesla Model Y Long Range
- ≈ 4.5 hours
- MG4 (64 kWh)
- ≈ 4 hours
- BYD Atto 3
- ≈ 3.5 hours
AC charging suits long stays (work, shopping centre, overnight). Calculated assuming the vehicle accepts AC up to 11 kW; the value is approximate.
How to charge
You start charging with the OnCharge app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many hours does charging take at Bilişim Vadisi Doğu OHT?
This point provides 22 kW AC charging; if your car accepts up to 11 kW AC, approximate 20% to 80% times are: Togg T10X 5.5 hours, Tesla Model Y Long Range 4.5 hours, MG4 (64 kWh) 4 hours and BYD Atto 3 3.5 hours. AC charging suits long stays such as work, shopping or overnight; for a quick stop on the road, check the nearest DC fast charging point on this page. Values are estimates.
How much does charging cost at Bilişim Vadisi Doğu OHT?
According to the tariff published by the OnCharge network, prices at this point are: AC 9.99 ₺/kWh. Example: charging a Togg T10X from 20% to 80% takes about 53 kWh and costs about 530 ₺ at the AC tariff. Payment is made with the OnCharge app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Bilişim Vadisi Doğu OHT have?
This point has 1 recorded socket: Type 2 (AC, 22 kW). There is no DC fast charging; the point provides AC charging. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Is Bilişim Vadisi Doğu OHT open 24/7?
Yes, according to the records Bilişim Vadisi Doğu OHT is open 24/7; you can charge at night too. For points inside shopping malls, hotels or car parks, the venue's opening hours may also apply; before setting off, it's a good idea to check the point's live status in the OnCharge app.
Other points nearby
Bilişim Vadisi Batı OHT
136 m · OnCharge · Type 2
22kW
KMO Bilişim Vadisi Doğu
1.4 km · OnCharge · Type 2
22kW
KMO Bilişim Vadisi Batı
1.4 km · OnCharge · Type 2
22kW
DOSTEL MAKİNA 80kW
2.0 km · Powerşarj · CCS2
80kW
Günak İnşaat 120KW DC
2.3 km · Powerşarj · CCS2
120kW
Kocaeli Kobi Organize Bölgesi, Dilovası
3.1 km · Eşarj · CCS2
180kW
Source: OnCharge + EPDK licence record · Updated: 21 August 2026 at 22:03 · How the data is collected
