Günak İnşaat 120KW DC
Powerşarj · Organize Sanayi Bölgesi, 5. Cadde 23A, 41455 Dilovası/Kocaeli, Türkiye, Kocaeli
- Max power
- 120kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 120kW
CCS2×2
DC
Price
Powerşarj doesn't publish a price for this point. The current tariff is shown in the network's own app. Powerşarj website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 120 kW, it ranks 13th by power among the 30 points with known power in Dilovası district. The nearest other DC point is 1000 m away: GEBKİM Akaryakıt İstasyonu (Solarşarj, 180 kW). There are 25 more DC points within 10 km. Nearby (3 km): 15 other points and 4 networks.
The Powerşarj network has 18 points in Kocaeli province; this one is among those in the Dilovası area.
- Power rank in Dilovası
- 13 / 30
- Nearest other DC
- 1000 m
- 3 km radius
- 16 points · 4 networks
Charging time here from 10% to 80% (120 kW DC)
- Togg T10X
- ≈ 40 min
- Tesla Model Y Long Range
- ≈ 35 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Powerşarj app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Günak İnşaat 120KW DC?
Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Günak İnşaat 120KW DC have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 120 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
GEBKİM Akaryakıt İstasyonu
975 m · Solarşarj · Type 2 · CCS2
180kW
KMO Bilişim Vadisi Doğu
1.1 km · OnCharge · Type 2
22kW
KMO Bilişim Vadisi Batı
1.1 km · OnCharge · Type 2
22kW
İmes OSB Mükemmeliyet Merkezi
1.4 km · Powerşarj · Type 2
22kW
Çerkeşli OSB 180 KW
1.6 km · Powerşarj · CCS2
180kW
İmes OSB Mükemmelliyet Merkezi
1.6 km · Power Elektronik Sanayi VE Ticaret Limited Şirketi · Type 2
22kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected
