Murgul Belediyesi
Green Science · Küre Mahallesi Küre Murgul / ARTVİN
- Max power
- 120kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 120kW
CCS2×2
DC
Price
Green Science doesn't publish a price for this point. The current tariff is shown in the network's own app.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 120 kW, it ranks 6th by power among the 37 points with known power in Artvin province. The nearest other DC point is 11 km away: Düzköy Kereste Fabrikası (Green Science, 120 kW). There is no other DC point within 10 km. There is no other registered charging point within 10 km; plan your charging around this one before you set off.
The Green Science network has 3 points in Artvin province; this one is among those in the Murgul area.
- Power rank in Artvin
- 6 / 37
- Nearest other DC
- 11 km
- Other points within 10 km
- none
Charging time here from 10% to 80% (120 kW DC)
- Togg T10X
- ≈ 40 min
- Tesla Model Y Long Range
- ≈ 35 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Green Science app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Murgul Belediyesi?
Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Murgul Belediyesi have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 120 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Düzköy Kereste Fabrikası
11 km · Green Science · CCS2
120kW
Borçka Yerleşkesi, Artvin Borçka - AC 2
12 km · OtoPriz · Type 2
22kW
Shell Artvin Borçka
13 km · Trugo · CCS2
180kW
Hera Petrol
16 km · Sharz · Type 2
22kW
Petrol Ofisi, Hera Pet., Artvin
16 km · Eşarj · CCS2
30kW
Hopa Yerleşkesi, Artvin Hopa - AC 2
18 km · OtoPriz · Type 2
22kW
Source: EPDK licence record (ŞRJ/12402) · Updated: 2 November 2026 at 17:35 · How the data is collected
