Charging stations in Murgul

1 public charging point in Murgul, Artvin, on the Green Science network. The fastest delivers 120 kW.

Charging points
1
DC fast
1
Max power
120kW
Networks
1

Charging infrastructure in Murgul: the numbers

Murgul ranks 8th among the 8 districts of Artvin by number of charging points; its share of the province's points is 3%. 1 point is DC fast (100%).

The district's most powerful point is Murgul Belediyesi at 120 kW (Green Science).

Rank in Artvin
8 / 8
DC share
100%

Charging points

1 charging point

Nearest charging points around Murgul

straight-line distance to the district centre

Charging networks in Murgul

Other districts in Artvin

Frequently asked questions

How many charging stations are there in Murgul?

In Murgul (Artvin), there is 1 public EV charging point; 1 of them (100%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.

Which charging network has the most stations in Murgul?

The most widespread charging network in Murgul (Artvin) is Green Science, with 1 point. All points here belong to this network; payment and starting a charge are done in the network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.

What is the fastest charging station in Murgul?

The highest recorded power in Murgul (Artvin) is 120 kW, offered by Murgul Belediyesi (Green Science, Murgul). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.

How long does it take to charge an electric car in Murgul?

The most powerful DC fast charging point in Murgul (Artvin) is Murgul Belediyesi (Green Science, Murgul) with 120 kW; approximate 10% to 80% times there: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.

Where can the Togg T10X charge at full speed in Murgul?

In Murgul (Artvin), there is no DC point with 150 kW or more; the most powerful point offers 120 kW, where the Togg T10X charges from 10% to 80% in about 40 min. Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.

Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy