Petrol Ofisi - Ortaköy Caddesi Ortaköy
e-POwer · Ortaköy Mahallesi Ortaköy Caddesi No:79 Silivri / İSTANBUL
- Max power
- 22kW
- Connectors
- 1
- Current
- AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 22kW
Type 2×1
AC8.99 ₺/kWh
Price
- AC
- 8.99 ₺/kWh
e-POwer standard tariff; prices may vary by location. Tariff source
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 22 kW, it ranks 28th by power among the 57 points with known power in Silivri district. This point offers AC (slow) charging; the nearest DC fast charger is 1.8 km away: Opet Kartalkaya (WAT Mobilite, 120 kW). Nearby (3 km): 2 other points and 3 networks.
The e-POwer network has 5 points in İstanbul province; this one is among those in the Silivri area.
- Power rank in Silivri
- 28 / 57
- Nearest DC
- 1.8 km
- 3 km radius
- 3 points · 3 networks
Charging time here from 20% to 80% (AC up to 11 kW)
- Togg T10X
- ≈ 5.5 hours
- Tesla Model Y Long Range
- ≈ 4.5 hours
- MG4 (64 kWh)
- ≈ 4 hours
- BYD Atto 3
- ≈ 3.5 hours
AC charging suits long stays (work, shopping centre, overnight). Calculated assuming the vehicle accepts AC up to 11 kW; the value is approximate.
How to charge
You start charging with the e-POwer app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many hours does charging take at Petrol Ofisi - Ortaköy Caddesi Ortaköy?
This point provides 22 kW AC charging; if your car accepts up to 11 kW AC, approximate 20% to 80% times are: Togg T10X 5.5 hours, Tesla Model Y Long Range 4.5 hours, MG4 (64 kWh) 4 hours and BYD Atto 3 3.5 hours. AC charging suits long stays such as work, shopping or overnight; for a quick stop on the road, check the nearest DC fast charging point on this page. Values are estimates.
How much does charging cost at Petrol Ofisi - Ortaköy Caddesi Ortaköy?
According to the tariff published by the e-POwer network, prices at this point are: AC 8.99 ₺/kWh. Example: charging a Togg T10X from 20% to 80% takes about 53 kWh and costs about 480 ₺ at the AC tariff. Payment is made with the e-POwer app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Petrol Ofisi - Ortaköy Caddesi Ortaköy have?
This point has 1 recorded socket: Type 2 (AC, 22 kW). There is no DC fast charging; the point provides AC charging. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Selimpaşa
1.7 km · OnLIFE · Type 2
22kW
Opet Kartalkaya
1.8 km · WAT Mobilite · CCS2
120kW
Enerji Petrol-Selimpaşa
3.1 km · Energy Enerjik · CCS2
120kW
Petrol Ofisi - Hümayun Caddesi Ortaköy
3.1 km · e-POwer · Type 2
22kW
TÜVTÜRK Araç Muayene İstasyonu-Kavaklı/İSTANBUL
4.5 km · Tüvturk · Type 2
22kW
Garden ET Lokantası
5.8 km · Volti · Type 2
11kW
Source: EPDK licence record (ŞRJ/4115) · Updated: 2 November 2026 at 17:35 · How the data is collected
