Tekstilkent G3 Blok / 180 KW DC Şarj İstasyonu
AOS · TEKSTİLKENT, Esenler / İstanbul
- Max power
- 180kW
- Connectors
- 1
- Current
- HPC
- Open
- 24/7
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 180kW
CCS2×1
HPC
Price
AOS doesn't publish a price for this point. The current tariff is shown in the network's own app. AOS website
Facility
- Opening hours: Open 24/7
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 74 points with known power in Esenler district, it is 2nd (180 kW). The nearest other DC point is 300 m away: 34- Esenler-Oruçreis-Karavil (Lumicle, 180 kW). There are 375 more DC points within 10 km. Within 3 km there are 95 other charging points and 29 different networks in total; if one is busy, an alternative is easy to find nearby.
The AOS network has 100 points in İstanbul province; this one is among those in the Esenler area.
- Power rank in Esenler
- 2 / 74
- Nearest other DC
- 300 m
- 3 km radius
- 96 points · 29 networks
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the AOS app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Tekstilkent G3 Blok / 180 KW DC Şarj İstasyonu charging station?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Tekstilkent G3 Blok / 180 KW DC Şarj İstasyonu have?
This point has 1 recorded socket: CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Is Tekstilkent G3 Blok / 180 KW DC Şarj İstasyonu open 24/7?
Yes, according to the records Tekstilkent G3 Blok / 180 KW DC Şarj İstasyonu is open 24/7; you can charge at night too. For points inside shopping malls, hotels or car parks, the venue's opening hours may also apply; before setting off, it's a good idea to check the point's live status in the AOS app.
Other points nearby
Ömür İstanbul Otoparkı 1
215 m · GEL DOL · Type 2
22kW
Tekstilkent Otopark G1 22 kW AC 02
269 m · GEL DOL · Type 2
22kW
34- Esenler-Oruçreis-Karavil
302 m · Lumicle · CCS2 · Type 2
180kW
Ömür İstanbul Sitesi Otopark 2 11 kW AC 02
306 m · GEL DOL · Type 2
22kW
Tekstilkent G1 Garaj
400 m · GEL DOL · Type 2
22kW
Ömür İstanbul Sitesi Otoparkı 1 11 kW AC 02
411 m · GEL DOL · Type 2
22kW
Source: AOS + EPDK licence record · Updated: 27 February 2025 at 12:27 · How the data is collected
