34- Esenler-Oruçreis-Karavil
Lumicle · Oruçreis Mahallesi Vadi Caddesi No:3 Giyimkent Sitesi Esenler / İSTANBUL
- Max power
- 180kW
- Connectors
- 8
- Current
- DC / AC / HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 180kW
CCS2×1
HPC
- 120kW
CCS2×2
DC
- 22kW
Type 2×5
AC
Price
Lumicle doesn't publish a price for this point. The current tariff is shown in the network's own app. Lumicle website
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 180 kW, it ranks 2nd by power among the 74 points with known power in Esenler district. The nearest other DC point is 150 m away: LUMICLE ESENLER 180 kW DC-2 (Lumicle, 180 kW). There are 385 more DC points within 10 km. Nearby (3 km): 94 other points and 27 networks; you may need different networks' apps.
The Lumicle network has 34 points in İstanbul province; this one is among those in the Esenler area.
- Power rank in Esenler
- 2 / 74
- Nearest other DC
- 150 m
- 3 km radius
- 95 points · 27 networks
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Lumicle app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at 34- Esenler-Oruçreis-Karavil?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does 34- Esenler-Oruçreis-Karavil have?
This point has 8 recorded sockets: 2 × CCS2 (DC, 120 kW), 5 × Type 2 (AC, 22 kW) and CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
LUMICLE ESENLER 180 kW DC-2
164 m · Lumicle · CCS2
180kW
LUMICLE ESENLER 22 kW AC-5
164 m · Lumicle · Type 2
22kW
LUMICLE ESENLER 22 kW AC-4
164 m · Lumicle · Type 2
22kW
LUMICLE ESENLER 22 kW AC-3
164 m · Lumicle · Type 2
22kW
LUMICLE ESENLER 22 kW AC-2
164 m · Lumicle · Type 2
22kW
LUMICLE ESENLER 22 kW AC-1
164 m · Lumicle · Type 2
22kW
Source: EPDK licence record (ŞRJ/2817) · Updated: 21 August 2026 at 23:51 · How the data is collected
