Charging stations in Şiran

3 public charging points in Şiran, Gümüşhane, across 2 networks. The fastest delivers 90 kW.

Charging points
3
DC fast
1
Max power
90kW
Networks
2

Charging infrastructure in Şiran: the numbers

Şiran ranks 2nd among the 6 districts of Gümüşhane by number of charging points; its share of the province's points is 12%. 1 point is DC fast (33%).

The district's most powerful point is Sultan Pestil Köme, Gümüşhane at 90 kW (Eşarj). 2 networks: Wattreise (2), Eşarj (1). 1 point is listed as open 24/7.

Rank in Gümüşhane
2 / 6
DC share
33%

Charging points

3 charging points

Nearest charging points around Şiran

straight-line distance to the district centre

Charging networks in Şiran

Other districts in Gümüşhane

Frequently asked questions

How many charging stations are there in Şiran?

In Şiran (Gümüşhane), there are 3 public EV charging points; 1 of them (33%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.

Which charging network has the most stations in Şiran?

The most widespread charging network in Şiran (Gümüşhane) is Wattreise, with 2 points. It is followed by Eşarj (1). In total, stations from 2 different networks are present; payment and starting a charge are done in each network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.

What is the fastest charging station in Şiran?

The highest recorded power in Şiran (Gümüşhane) is 90 kW, offered by Sultan Pestil Köme, Gümüşhane (Eşarj, Şiran). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.

How long does it take to charge an electric car in Şiran?

The most powerful DC fast charging point in Şiran (Gümüşhane) is Sultan Pestil Köme, Gümüşhane (Eşarj, Şiran) with 90 kW; approximate 10% to 80% times there: Togg T10X 50 min, Tesla Model Y Long Range 45 min, MG4 (64 kWh) 35 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.

Where can the Togg T10X charge at full speed in Şiran?

In Şiran (Gümüşhane), there is no DC point with 150 kW or more; the most powerful point offers 90 kW, where the Togg T10X charges from 10% to 80% in about 50 min. Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.

Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy