1 public charging point in Köse, Gümüşhane, on the WAT Mobilite network. The fastest delivers 120 kW.
Köse ranks 6th among the 6 districts of Gümüşhane by number of charging points; its share of the province's points is 4%. 1 point is DC fast (100%).
Highest power 120 kW: Köse Belediyesi, WAT Mobilite.
TP, Murathanoğulları, Gümüşhane
17 km · Eşarj · Merkez · CCS2
60kW
Pasinli Mehmet Petrol
18 km · Ovolt · Kelkit · CCS2
200kW
Hünkar Cafe
19 km · Green Science · Kelkit · CCS2
120kW
Gümüşhane Üniversitesi
23 km · Wattreise · Merkez · Type 2
22kW
Gümüşhane Devlet Hastanesi
24 km · Trugo · Merkez · CCS2
180kW
Çimenler Otomotiv, Gümüşhane
25 km · Eşarj · Merkez · CCS2
120kW
In Köse (Gümüşhane), there is 1 public EV charging point; 1 of them (100%) support DC fast charging. Filter the map by socket type and power to find a point that suits your car. Figures come from EPDK licence records and charging network data, as of 19 October 2026.
The most widespread charging network in Köse (Gümüşhane) is WAT Mobilite, with 1 point. All points here belong to this network; payment and starting a charge are done in the network's own app. On the map, use the network filter to see only one network's points and the socket type filter to see those that fit your car.
The highest recorded power in Köse (Gümüşhane) is 120 kW, offered by Köse Belediyesi (WAT Mobilite, Köse). In DC fast charging, the car reduces power on its own as the battery approaches 80%; the actual time depends on the maximum DC power your car accepts. The point's sockets and price are on the station page.
The most powerful DC fast charging point in Köse (Gümüşhane) is Köse Belediyesi (WAT Mobilite, Köse) with 120 kW; approximate 10% to 80% times there: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; values are estimates, and cold weather makes charging take longer.
In Köse (Gümüşhane), there is no DC point with 150 kW or more; the most powerful point offers 120 kW, where the Togg T10X charges from 10% to 80% in about 40 min. Use the "Fits My Vehicle" and 150+ kW filters on the map to list these points.
Source: EPDK licence records and charging networks · Updated: 19 October 2026 at 04:38 · How the data is collected
We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy