Ziraat Merkez İFM
Ziraat İYGG · Finanskent Mahallesi Finans Caddesi No:44 Ümraniye / İSTANBUL
- Max power
- 80kW
- Connectors
- 54
- Current
- DC / AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 80kW
CCS2×2
DC
- 22kW
Type 2×34
AC
- 11kW
Type 2×18
AC
Price
Ziraat İYGG doesn't publish a price for this point. The current tariff is shown in the network's own app.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 247 points with known power in Ümraniye district, it is 57th (80 kW). The nearest other DC point is 300 m away: İstanbul Finans Merkezi T Blok -3 (Trugo, 180 kW). There are 352 more DC points within 10 km. Within 3 km there are 285 other charging points and 58 different networks in total.
The Ziraat İYGG network has 2 points in İstanbul province; this one is among those in the Ümraniye area.
- Power rank in Ümraniye
- 57 / 247
- Nearest other DC
- 300 m
- 3 km radius
- 286 points · 58 networks
Charging time here from 10% to 80% (80 kW DC)
- Togg T10X
- ≈ 1 h
- Tesla Model Y Long Range
- ≈ 50 min
- MG4 (64 kWh)
- ≈ 40 min
- BYD Atto 3
- ≈ 40 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Ziraat İYGG app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Ziraat Merkez İFM charging station?
Approximate 10% to 80% times with the 80 kW DC socket: Togg T10X 1 h, Tesla Model Y Long Range 50 min, MG4 (64 kWh) 40 min and BYD Atto 3 40 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 80 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Ziraat Merkez İFM have?
This point has 54 recorded sockets: 2 × CCS2 (DC, 80 kW), 34 × Type 2 (AC, 22 kW) and 18 × Type 2 (AC, 11 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
İstanbul Finans Merkezi RKP
126 m · Trugo · Type 2
22kW
İstanbul Finans Merkezi AVM 1. Bölge
190 m · Trugo · Type 2
22kW
İstanbul Finans Merkezi K Blok -1
191 m · Trugo · Type 2
22kW
İstanbul Finans Merkezi K Blok -2
191 m · Trugo · Type 2
22kW
Türkiye Vakıflar Bankası Genel Müdürlüğü A Blok
206 m · ZES · Type 2
22kW
TCMB İstanbul Finans Merkezi
276 m · Trugo · Type 2
22kW
Source: EPDK licence record (ŞRJ/10752) · Updated: 2 November 2026 at 17:35 · How the data is collected