Oksijen O375 İzmir Yönü
ZES · İstanbul-izmir Otoyolu 375.km Mahallesi Şehzadeler / MANİSA
- Max power
- 720kW
- Connectors
- 10
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Enerji aktarımı bittikten sonra araç çekilmezse 15. dk'da 150 ₺, 30. dk'da 300 ₺, 45. dk'da 450 ₺, 60. dk'da 500 ₺ eklenir.source
With the ZES app you can also charge at
Solarşarj (ZES uygulamasındaki Roaming sekmesinden) · WAT Mobilite
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 720kW
CCS2×10
HPC16.49 ₺/kWh
Price
- HPC
- 16.49 ₺/kWh
ZES standard tariff; prices may vary by location. Tariff source
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
At 720 kW, one of the 3 most powerful points among the 24 points with known power in Şehzadeler district. The nearest other DC point is at the same address: Oksijen 375 İzmir Yönü, Manisa (Eşarj, 360 kW). There are 19 more DC points within 10 km. Nearby (3 km): 9 other points and 5 networks; you may need different networks' apps.
The DC tariff of 16.49 ₺/kWh is 10% above the median of the 70 known DC tariffs in Manisa (14.98 ₺/kWh). The ZES network has 59 points in Manisa province; this one is among those in the Şehzadeler area.
- Power rank in Şehzadeler
- 1 / 24
- Nearest other DC
- at the same address
- 3 km radius
- 10 points · 5 networks
- DC tariff
- 16.49 ₺/kWh
Charging time here from 10% to 80% (720 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 20 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the ZES app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Oksijen O375 İzmir Yönü?
Approximate 10% to 80% times with the 720 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 20 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 720 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Oksijen O375 İzmir Yönü?
According to the tariff published by the ZES network, prices at this point are: DC 16.49 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 1,020 ₺ at the DC tariff. Payment is made with the ZES app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Oksijen O375 İzmir Yönü have?
This point has 10 recorded sockets: 10 × CCS2 (HPC, 720 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Oksijen 375 İzmir Yönü, Manisa
26 m · Eşarj · CCS2
360kW
LUMICLE OKSİJEN O375 İZMİR YÖNÜ 240 kW DC-3
61 m · Lumicle · CCS2
360kW
Oksijen O375 İzmir Yönü
85 m · En Yakıt · CCS2
320kW
O375 Oksijen Manisa İstanbul Yönü
119 m · Trugo · CCS2
180kW
O375 Oksijen Manisa İzmir Yönü
138 m · Trugo · CCS2
180kW
LUMICLE OKSİJEN O375 İSTANBUL YÖNÜ 240 kW DC-3
178 m · Lumicle · CCS2
360kW
Source: EPDK licence record (ŞRJ/1709) · Updated: 2 November 2026 at 17:35 · How the data is collected
