Gömü Belediyesi Afyonkarahisar
ZES · Dörtyol Mah.
- Max power
- 22kW
- Connectors
- 2
- Current
- AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Enerji aktarımı bittikten sonra araç çekilmezse 15. dk'da 150 ₺, 30. dk'da 300 ₺, 45. dk'da 450 ₺, 60. dk'da 500 ₺ eklenir.source
With the ZES app you can also charge at
Solarşarj (ZES uygulamasındaki Roaming sekmesinden) · WAT Mobilite
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 22kW
Type 2×2
AC10.99 ₺/kWh
Price
- AC
- 10.99 ₺/kWh
ZES standard tariff; prices may vary by location. Tariff source
Facility
- Nearby: Shop
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
At 22 kW, it is in the slow-charging group among the 7 points with known power in Emirdağ district; for a quick stop, the nearest DC point below is the better choice. This point offers AC (slow) charging; the nearest DC fast charger is 7.0 km away: Emirdağ Çıldıroğulları Petrol Ofisi (Trugo, 180 kW). The ZES network has 103 points in Afyonkarahisar province; this one is among those in the Emirdağ area.
- Power rank in Emirdağ
- 5 / 7
- Nearest DC
- 7.0 km
Charging time here from 20% to 80% (AC up to 11 kW)
- Togg T10X
- ≈ 5.5 hours
- Tesla Model Y Long Range
- ≈ 4.5 hours
- MG4 (64 kWh)
- ≈ 4 hours
- BYD Atto 3
- ≈ 3.5 hours
AC charging suits long stays (work, shopping centre, overnight). Calculated assuming the vehicle accepts AC up to 11 kW; the value is approximate.
How to charge
You start charging with the ZES app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many hours does charging take at Gömü Belediyesi Afyonkarahisar?
This point provides 22 kW AC charging; if your car accepts up to 11 kW AC, approximate 20% to 80% times are: Togg T10X 5.5 hours, Tesla Model Y Long Range 4.5 hours, MG4 (64 kWh) 4 hours and BYD Atto 3 3.5 hours. AC charging suits long stays such as work, shopping or overnight; for a quick stop on the road, check the nearest DC fast charging point on this page. Values are estimates.
How much does charging cost at Gömü Belediyesi Afyonkarahisar?
According to the tariff published by the ZES network, prices at this point are: AC 10.99 ₺/kWh. Example: charging a Togg T10X from 20% to 80% takes about 53 kWh and costs about 580 ₺ at the AC tariff. Payment is made with the ZES app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Gömü Belediyesi Afyonkarahisar have?
This point has 2 recorded sockets: 2 × Type 2 (AC, 22 kW). There is no DC fast charging; the point provides AC charging. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Emirdağ Çıldıroğulları Petrol Ofisi
7.0 km · Trugo · CCS2
180kW
Çıldır Beton, Afyonkarahisar
7.3 km · Eşarj · CCS2
120kW
Emirdağ AVM
7.3 km · CTG Elektrik Anonim Şirketi · CCS2 · Type 2
120kW
Emirdağ Otogar
7.4 km · ZES
Grand Palace DC
9.1 km · Greenwatt · CCS2
120kW
Cumhuriyet Sucukları Dinlenme Tesisi - 2
16 km · ZES · CCS2
180kW
Source: ZES + EPDK licence record · Updated: 19 October 2026 at 04:37 · How the data is collected
