Gaziemir Kipa
ZES · Akçay Caddesi No:253/3 Gaziemir / İZMİR
- Max power
- 60kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Enerji aktarımı bittikten sonra araç çekilmezse 15. dk'da 150 ₺, 30. dk'da 300 ₺, 45. dk'da 450 ₺, 60. dk'da 500 ₺ eklenir.source
With the ZES app you can also charge at
Solarşarj (ZES uygulamasındaki Roaming sekmesinden) · WAT Mobilite
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 60kW
CCS2×2
DC12.99 ₺/kWh
Price
- DC
- 12.99 ₺/kWh
ZES standard tariff; prices may vary by location. Tariff source
Facility
- Nearby: Restaurant · Shop · Parking
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 60 kW, it ranks 19th by power among the 48 points with known power in Gaziemir district. The nearest other DC point is 100 m away: Carrefoursa Gaziemir, İzmir (Eşarj, 120 kW). There are 35 more DC points within 10 km. Nearby (3 km): 42 other points and 15 networks.
The DC tariff of 12.99 ₺/kWh is 13% below the median of the 180 known DC tariffs in İzmir (14.90 ₺/kWh). The ZES network has 149 points in İzmir province; this one is among those in the Gaziemir area.
- Power rank in Gaziemir
- 19 / 48
- Nearest other DC
- 100 m
- 3 km radius
- 43 points · 15 networks
- DC tariff
- 12.99 ₺/kWh
Charging time here from 10% to 80% (60 kW DC)
- Togg T10X
- ≈ 1 h 5 min
- Tesla Model Y Long Range
- ≈ 55 min
- MG4 (64 kWh)
- ≈ 50 min
- BYD Atto 3
- ≈ 45 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the ZES app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Gaziemir Kipa?
Approximate 10% to 80% times with the 60 kW DC socket: Togg T10X 1 h 5 min, Tesla Model Y Long Range 55 min, MG4 (64 kWh) 50 min and BYD Atto 3 45 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 60 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Gaziemir Kipa?
According to the tariff published by the ZES network, prices at this point are: DC 12.99 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 800 ₺ at the DC tariff. Payment is made with the ZES app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Gaziemir Kipa have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 60 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Kipa AVM Gaziemir
76 m · Miggo · Type 2
22kW
Carrefoursa Gaziemir, İzmir
121 m · Eşarj · CCS2
120kW
Poyraz Residence Suites
128 m · Voltrun · Type 2
10kW
Vosmer Gaziemir - VW
169 m · D-Charge · CCS2 · Type 2
180kW
Altay Spor Kulubü
283 m · HIZZLAN Charge N'Drive · CCS2
120kW
Mengerler (Dokuz Eylül), İzmir
300 m · Eşarj · CCS2
120kW
Source: EPDK licence record (ŞRJ/9101) · Updated: 2 November 2026 at 17:35 · How the data is collected
