Acıbadem Maslak Proje Yönetimi

ZES · Darüşşafaka Mahallesi Akgün Caddesi Sarıyer / İSTANBUL

See the spot and its surroundings before you go

Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.

No status notes in the last 3 hours. If you're here, share:

Right now:

Was your charging experience good?

No votes yet. Be the first.

Idle (blocking) fee after charging

Enerji aktarımı bittikten sonra araç çekilmezse 15. dk'da 150 ₺, 30. dk'da 300 ₺, 45. dk'da 450 ₺, 60. dk'da 500 ₺ eklenir.source

With the ZES app you can also charge at

Solarşarj (ZES uygulamasındaki Roaming sekmesinden) · WAT Mobilite

Customer service

0850 339 99 37

Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.

See it on the map with nearby points

Price

ZES doesn't publish a price for this point. The current tariff is shown in the network's own app. ZES website

Access

Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.

  • Open to the public?

    No information yet

  • Usable 24/7?

    No information yet

  • Is there a parking fee?

    No information yet

This point: location and surroundings

This point offers AC (slow) charging; the nearest DC fast charger is 900 m away: Zeplin Maslak 1453 İnOto (Zeplin Enerji, 90 kW). Within 3 km there are 108 other charging points and 32 different networks in total; you may need different networks' apps. The ZES network has 443 points in İstanbul province; this one is among those in the Sarıyer area.

Nearest DC
900 m
3 km radius
109 points · 32 networks

How to charge

You start charging with the ZES app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.

Other points nearby

straight-line

Something wrong?

If you've seen wrong information or a connector that doesn't work, tell us; we'll check and fix it.

Source: EPDK licence record (ŞRJ/10920) · Updated: 2 November 2026 at 17:35 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy