Zeplin Ağaoğlu My Newwork
Zeplin Enerji · Barbaros Mahallesi Ihlamur Sokağı No:3 Merkez Ataşehir / İSTANBUL
- Max power
- 60kW
- Connectors
- 12
- Current
- AC / DC
Access may be restricted. This point is not registered as public: it may be reserved for a residential complex, hotel, company or fleet. Check with the network's app or the operator before you set off.
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 60kW
CCS2×2
DC
- 22kW
Type 2×1
AC
- 11kW
Type 2×9
AC
Price
Zeplin Enerji doesn't publish a price for this point. The current tariff is shown in the network's own app. Zeplin Enerji website
Facility
- Located at: Shopping mall
- Nearby: Café · Restaurant
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 60 kW, it ranks 66th by power among the 177 points with known power in Ataşehir district. The nearest other DC point is 100 m away: Bulvar 216 AVM (Trugo, 180 kW). There are 355 more DC points within 10 km. Nearby (3 km): 247 other points and 61 networks; you may need different networks' apps.
The Zeplin Enerji network has 115 points in İstanbul province; this one is among those in the Ataşehir area.
- Power rank in Ataşehir
- 66 / 177
- Nearest other DC
- 100 m
- 3 km radius
- 248 points · 61 networks
Charging time here from 10% to 80% (60 kW DC)
- Togg T10X
- ≈ 1 h 5 min
- Tesla Model Y Long Range
- ≈ 55 min
- MG4 (64 kWh)
- ≈ 50 min
- BYD Atto 3
- ≈ 45 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Zeplin Enerji app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Zeplin Ağaoğlu My Newwork?
Approximate 10% to 80% times with the 60 kW DC socket: Togg T10X 1 h 5 min, Tesla Model Y Long Range 55 min, MG4 (64 kWh) 50 min and BYD Atto 3 45 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 60 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Zeplin Ağaoğlu My Newwork have?
This point has 12 recorded sockets: Type 2 (AC, 22 kW), 9 × Type 2 (AC, 11 kW) and 2 × CCS2 (DC, 60 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Uphıll Court Site B Ada 7
12 m · Otojet · Type 2
22kW
Uphıll Court Site B Ada 6
12 m · Otojet · Type 2
11kW
Uphıll Court Site B Ada 5
12 m · Otojet · Type 2
11kW
Uphıll Court Site B Ada 4
12 m · Otojet · Type 2
11kW
Uphıll Court Site B Ada 3
12 m · Otojet · Type 2
11kW
Uphıll Court Site B Ada 2
12 m · Otojet · Type 2
11kW
Source: EPDK licence record (ŞRJ/11724) · Updated: 21 August 2026 at 23:51 · How the data is collected
