La Mer Beach Bodrum
WAT Mobilite · Akyarlar Mahallesi Barış Manço Caddesi No:39 Bodrum / MUĞLA
- Max power
- 11kW
- Connectors
- 4
- Current
- AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Customer service
0850 755 98 98 · 7/24
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 11kW
Type 2×4
AC10.99 ₺/kWh
Price
- AC
- 10.99 ₺/kWh
WAT Mobilite standard tariff; prices may vary by location. Tariff source
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
At 11 kW, it is in the slow-charging group among the 202 points with known power in Bodrum district; for a quick stop, the nearest DC point below is the better choice. This point offers AC (slow) charging; the nearest DC fast charger is 600 m away: Radisson Collection Hotel Muğla (ZES, 60 kW). Nearby (3 km): 11 other points and 5 networks.
The WAT Mobilite network has 18 points in Muğla province; this one is among those in the Bodrum area.
- Power rank in Bodrum
- 193 / 202
- Nearest DC
- 600 m
- 3 km radius
- 12 points · 5 networks
Charging time here from 20% to 80% (AC up to 11 kW)
- Togg T10X
- ≈ 5.5 hours
- Tesla Model Y Long Range
- ≈ 4.5 hours
- MG4 (64 kWh)
- ≈ 4 hours
- BYD Atto 3
- ≈ 3.5 hours
AC charging suits long stays (work, shopping centre, overnight). Calculated assuming the vehicle accepts AC up to 11 kW; the value is approximate.
How to charge
You start charging with the WAT Mobilite app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many hours does charging take at La Mer Beach Bodrum?
This point provides 11 kW AC charging; if your car accepts up to 11 kW AC, approximate 20% to 80% times are: Togg T10X 5.5 hours, Tesla Model Y Long Range 4.5 hours, MG4 (64 kWh) 4 hours and BYD Atto 3 3.5 hours. AC charging suits long stays such as work, shopping or overnight; for a quick stop on the road, check the nearest DC fast charging point on this page. Values are estimates.
How much does charging cost at La Mer Beach Bodrum?
According to the tariff published by the WAT Mobilite network, prices at this point are: AC 10.99 ₺/kWh. Example: charging a Togg T10X from 20% to 80% takes about 53 kWh and costs about 580 ₺ at the AC tariff. Payment is made with the WAT Mobilite app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does La Mer Beach Bodrum have?
This point has 4 recorded sockets: 4 × Type 2 (AC, 11 kW). There is no DC fast charging; the point provides AC charging. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Kefaluka Resort Hotel
467 m · ZES · Type 2
22kW
Anthaven Bodrum
592 m · Voltrun · Type 2
22kW
Radisson Collection Hotel Muğla
592 m · ZES · CCS2
60kW
BioGreen: Liv Hotel - 22 kW AC
723 m · Biogreen · Type 2
22kW
BioGreen: Sentido Hotel - 22 kW AC
745 m · Biogreen · Type 2
22kW
Anthaven Mall
1.4 km · ZES · CCS2
180kW
Source: EPDK licence record (ŞRJ/14402) · Updated: 2 November 2026 at 17:35 · How the data is collected
