Akçaabat Cemil Usta
WAT Mobilite · Dürbinar Mahallesi Sahil Park Alanı Caddesi No:120 Akçaabat / TRABZON
- Max power
- 180kW
- Connectors
- 4
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Customer service
0850 755 98 98 · 7/24
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 180kW
CCS2×4
HPC14.49 ₺/kWh
Price
- DC
- 14.49 ₺/kWh
WAT Mobilite standard tariff; prices may vary by location. Tariff source
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
At 180 kW, one of the 4 most powerful points among the 37 points with known power in Akçaabat district. The nearest other DC point is 950 m away: Ustaoğlu Söğütlü Park Evleri (Voltrun, 120 kW). There are 13 more DC points within 10 km. Within 3 km there are 13 other charging points and 7 different networks in total; if one is busy, an alternative is easy to find nearby.
The DC tariff of 14.49 ₺/kWh is 3% below the median of the 57 known DC tariffs in Trabzon (14.90 ₺/kWh). The WAT Mobilite network has 12 points in Trabzon province; this one is among those in the Akçaabat area.
- Power rank in Akçaabat
- 1 / 37
- Nearest other DC
- 950 m
- 3 km radius
- 14 points · 7 networks
- DC tariff
- 14.49 ₺/kWh
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the WAT Mobilite app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Akçaabat Cemil Usta charging station?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Akçaabat Cemil Usta?
According to the tariff published by the WAT Mobilite network, prices at this point are: DC 14.49 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 900 ₺ at the DC tariff. Payment is made with the WAT Mobilite app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Akçaabat Cemil Usta have?
This point has 4 recorded sockets: 4 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Cemilusta Akçaabat Köfte 1
1.0 km · En Yakıt · CCS2
180kW
Cemilusta Akçaabat Köfte 2
1.1 km · En Yakıt · CCS2
180kW
Nihat Usta Akçaabat Köfte Restaurant
1.4 km · ZES · Type 2
22kW
Saray Köfte Balık Restaurant Akçaabat
1.6 km · Voltrun · CCS2 · Type 2
120kW
B-Charge - Güngör OTO
2.3 km · B-Charge · Type 2
11kW
Türk Telekom Trabzon Akçaabat Ofisi
2.9 km · E4 Şarj · Type 2
22kW
Source: EPDK licence record (ŞRJ/14268) · Updated: 2 November 2026 at 17:35 · How the data is collected
