İstanbul 216 Konut Sitesi 2.Etap
Voltrun · Dumlupınar Mahallesi Doruk Sokağı No:45/B Kadıköy / İSTANBUL
- Max power
- 21kW
- Connectors
- 2
- Current
- AC
Access may be restricted. This point is not registered as public: it may be reserved for a residential complex, hotel, company or fleet. Check with the network's app or the operator before you set off.
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 21kW
Type 2×2
AC10.90 ₺/kWh
Price
- AC
- 10.90 ₺/kWh
Voltrun standard tariff; prices may vary by location. Tariff source
Facility
- Nearby: Shop
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
At 21 kW, it is in the slow-charging group among the 99 points with known power in Kadıköy district; for a quick stop, the nearest DC point below is the better choice. This point offers AC (slow) charging; the nearest DC fast charger is 100 m away: İstanbul 216 Sitesi (Trugo, 180 kW). Nearby (3 km): 153 other points and 40 networks; you may need different networks' apps.
The Voltrun network has 365 points in İstanbul province; this one is among those in the Kadıköy area.
- Power rank in Kadıköy
- 82 / 99
- Nearest DC
- 100 m
- 3 km radius
- 154 points · 40 networks
Charging time here from 20% to 80% (AC up to 11 kW)
- Togg T10X
- ≈ 5.5 hours
- Tesla Model Y Long Range
- ≈ 4.5 hours
- MG4 (64 kWh)
- ≈ 4 hours
- BYD Atto 3
- ≈ 3.5 hours
AC charging suits long stays (work, shopping centre, overnight). Calculated assuming the vehicle accepts AC up to 11 kW; the value is approximate.
How to charge
You start charging with the Voltrun app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many hours does charging take at İstanbul 216 Konut Sitesi 2.Etap?
This point provides 21 kW AC charging; if your car accepts up to 11 kW AC, approximate 20% to 80% times are: Togg T10X 5.5 hours, Tesla Model Y Long Range 4.5 hours, MG4 (64 kWh) 4 hours and BYD Atto 3 3.5 hours. AC charging suits long stays such as work, shopping or overnight; for a quick stop on the road, check the nearest DC fast charging point on this page. Values are estimates.
How much does charging cost at İstanbul 216 Konut Sitesi 2.Etap?
According to the tariff published by the Voltrun network, prices at this point are: AC 10.90 ₺/kWh. Example: charging a Togg T10X from 20% to 80% takes about 53 kWh and costs about 580 ₺ at the AC tariff. Payment is made with the Voltrun app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does İstanbul 216 Konut Sitesi 2.Etap have?
This point has 2 recorded sockets: 2 × Type 2 (AC, 21 kW). There is no DC fast charging; the point provides AC charging. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
İstanbul 216 Sitesi
109 m · Trugo · CCS2
180kW
İstanbul 216 Kadıköy 1.Etap
122 m · Voltrun · Type 2
22kW
Fikirtepe Torkam
279 m · Aksa Şarj · Type 2
22kW
Zeplin Yenitepe Kadıköy 2.Etap
342 m · Zeplin Enerji · Type 2
20kW
Econ - Pırlanta Göztepe A Blok
473 m · Energy Charging Operator Network ECON · Type 2
20kW
Şuaelite Concept AC1-8
499 m · Beefull · Type 2
20kW
Source: EPDK licence record (ŞRJ/2872) · Updated: 2 November 2026 at 17:35 · How the data is collected
