A Plaza İŞ Merkezi
Voltrun · Etiler Mahallesi 829 Sokağı No:3 Muratpaşa / ANTALYA
- Max power
- 11kW
- Connectors
- 2
- Current
- AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 11kW
Type 2×2
AC10.90 ₺/kWh
Price
- AC
- 10.90 ₺/kWh
Voltrun standard tariff; prices may vary by location. Tariff source
Facility
- Nearby: Shop
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
At 11 kW, it is in the slow-charging group among the 133 points with known power in Muratpaşa district; for a quick stop, the nearest DC point below is the better choice. This point offers AC (slow) charging; the nearest DC fast charger is 150 m away: Otojet - Çınar Petrol (Otojet, 30 kW). Within 3 km there are 73 other charging points and 27 different networks in total; if one is busy, an alternative is easy to find nearby.
The Voltrun network has 63 points in Antalya province; this one is among those in the Muratpaşa area.
- Power rank in Muratpaşa
- 127 / 133
- Nearest DC
- 150 m
- 3 km radius
- 74 points · 27 networks
Charging time here from 20% to 80% (AC up to 11 kW)
- Togg T10X
- ≈ 5.5 hours
- Tesla Model Y Long Range
- ≈ 4.5 hours
- MG4 (64 kWh)
- ≈ 4 hours
- BYD Atto 3
- ≈ 3.5 hours
AC charging suits long stays (work, shopping centre, overnight). Calculated assuming the vehicle accepts AC up to 11 kW; the value is approximate.
How to charge
You start charging with the Voltrun app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many hours does charging take at A Plaza İŞ Merkezi?
This point provides 11 kW AC charging; if your car accepts up to 11 kW AC, approximate 20% to 80% times are: Togg T10X 5.5 hours, Tesla Model Y Long Range 4.5 hours, MG4 (64 kWh) 4 hours and BYD Atto 3 3.5 hours. AC charging suits long stays such as work, shopping or overnight; for a quick stop on the road, check the nearest DC fast charging point on this page. Values are estimates.
How much does charging cost at A Plaza İŞ Merkezi?
According to the tariff published by the Voltrun network, prices at this point are: AC 10.90 ₺/kWh. Example: charging a Togg T10X from 20% to 80% takes about 53 kWh and costs about 580 ₺ at the AC tariff. Payment is made with the Voltrun app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does A Plaza İŞ Merkezi have?
This point has 2 recorded sockets: 2 × Type 2 (AC, 11 kW). There is no DC fast charging; the point provides AC charging. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Otojet - Çınar Petrol
163 m · Otojet · CCS2
30kW
TotalEnergies Çınar Petrol Mevlana
167 m · Otojet · CCS2
30kW
Platin İş Merkezi
325 m · Getacharge · Type 2 · CCS2
120kW
Elips Royal Hotel
362 m · Voltrun · Type 2
22kW
BioGreen: Double Three By Hilton Antalya City Center
481 m · Biogreen · Type 2 · CCS2
180kW
Ersoy İkiz Otel
499 m · Voltrun · Type 2
22kW
Source: EPDK licence record (ŞRJ/9749) · Updated: 2 November 2026 at 17:35 · How the data is collected
