Porta Vadi
Volti · Hamidiye Mahallesi Merkez Cendere Caddesi No:103 Kağıthane / İSTANBUL
- Max power
- 120kW
- Connectors
- 6
- Current
- DC / AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 120kW
CCS2×2
DC
- 22kW
Type 2×4
AC
Price
Volti doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Nearby: Parking
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 94 points with known power in Kağıthane district, it is 15th (120 kW). The nearest other DC point is 500 m away: Avangart İstanbul (Trugo, 180 kW). There are 340 more DC points within 10 km. Within 3 km there are 144 other charging points and 36 different networks in total; if one is busy, an alternative is easy to find nearby.
The Volti network has 18 points in İstanbul province; this one is among those in the Kağıthane area.
- Power rank in Kağıthane
- 15 / 94
- Nearest other DC
- 500 m
- 3 km radius
- 145 points · 36 networks
Charging time here from 10% to 80% (120 kW DC)
- Togg T10X
- ≈ 40 min
- Tesla Model Y Long Range
- ≈ 35 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Volti app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Porta Vadi charging station?
Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Porta Vadi have?
This point has 6 recorded sockets: 2 × CCS2 (DC, 120 kW) and 4 × Type 2 (AC, 22 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Kordon İstanbul GüzelBahçeli Sitesi
45 m · Magic Line · Type 2
22kW
Kordon İstanbul Güzelbahçe Site Yönetimi
45 m · Magic Line · Type 2
22kW
Kordon İstanbul GüzelYalı Sitesi
430 m · Magic Line · Type 2
22kW
Nurol Life
494 m · Voltrun · Type 2
21kW
Avangart A1 Blok
503 m · Trugo · Type 2
22kW
Avangart A2 Blok
503 m · Trugo · Type 2
22kW
Source: EPDK licence record (ŞRJ/4289) · Updated: 2 November 2026 at 17:35 · How the data is collected
