Yaşar Üniversitesi
Varr TM · Kazım Dirik Mahallesi Üniversite Caddesi No:37-39 Bornova / İZMİR
- Max power
- 80kW
- Connectors
- 5
- Current
- AC / DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 80kW
CCS2×2
DC
- 22kW
Type 2×3
AC
Price
Varr TM doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Nearby: Parking
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 79 points with known power in Bornova district, it is 29th (80 kW). The nearest other DC point is 200 m away: Renault Mais İzmir Şube (Otojet, 150 kW). There are 92 more DC points within 10 km. Within 3 km there are 92 other charging points and 25 different networks in total; you may need different networks' apps.
The Varr TM network has 26 points in İzmir province; this one is among those in the Bornova area.
- Power rank in Bornova
- 29 / 79
- Nearest other DC
- 200 m
- 3 km radius
- 93 points · 25 networks
Charging time here from 10% to 80% (80 kW DC)
- Togg T10X
- ≈ 1 h
- Tesla Model Y Long Range
- ≈ 50 min
- MG4 (64 kWh)
- ≈ 40 min
- BYD Atto 3
- ≈ 40 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Varr TM app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Yaşar Üniversitesi charging station?
Approximate 10% to 80% times with the 80 kW DC socket: Togg T10X 1 h, Tesla Model Y Long Range 50 min, MG4 (64 kWh) 40 min and BYD Atto 3 40 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 80 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Yaşar Üniversitesi have?
This point has 5 recorded sockets: 3 × Type 2 (AC, 22 kW) and 2 × CCS2 (DC, 80 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Mia Suits Sitesi, Bornova - AC 2
84 m · OtoPriz · Type 2
22kW
Mia Suits Sitesi, Bornova - AC 1
84 m · OtoPriz · Type 2
22kW
Park Yaşam Bornova A Blok
128 m · OtoWATT · Type 2
21kW
Park Yaşam Bornova C Blok
128 m · OtoWATT · Type 2
21kW
Renault Mais İzmir Şube
177 m · Otojet · CCS2
150kW
Şarjon EGE ÜNİ. Hast. Çocuk Acil Otopark Şarj İstasyonu
208 m · Şarjon
Source: EPDK licence record (ŞRJ/7740) · Updated: 2 November 2026 at 17:35 · How the data is collected