İZMİR Atatürk OSB
Varr TM · Izmır Ataturk Osb Mahallesi No:42 Çiğli / İZMİR
- Max power
- 180kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 180kW
CCS2×2
HPC
Price
Varr TM doesn't publish a price for this point. The current tariff is shown in the network's own app.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 180 kW, it ranks 2nd by power among the 51 points with known power in Çiğli district. The nearest other DC point is 350 m away: Avek Karşıyaka - VW (D-Charge, 180 kW). There are 71 more DC points within 10 km. Nearby (3 km): 45 other points and 15 networks; you may need different networks' apps.
The Varr TM network has 26 points in İzmir province; this one is among those in the Çiğli area.
- Power rank in Çiğli
- 2 / 51
- Nearest other DC
- 350 m
- 3 km radius
- 46 points · 15 networks
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Varr TM app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at İZMİR Atatürk OSB?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does İZMİR Atatürk OSB have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Avek Karşıyaka - VW
330 m · D-Charge · CCS2 · Type 2
180kW
Avek Karşıyaka - Skoda
330 m · D-Charge · CCS2
360kW
Avek Karşıyaka - Cupra
330 m · D-Charge · CCS2 · Type 2
180kW
Avek Karşıyaka - Audi
330 m · D-Charge · CCS2 · Type 2
120kW
Otojet - Altuğ Çiğli
374 m · Otojet · CCS2
150kW
TotalEnergies Altuğ Çiğili
467 m · Otojet · CCS2
150kW
Source: EPDK licence record (ŞRJ/10451) · Updated: 2 November 2026 at 17:35 · How the data is collected