Yıldız Teknopark Yönetim Binası 160 KW DC
Vale · ESENLER DAVUTPAŞA KAMPÜSÜ , İSTANBUL
- Max power
- 150kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 150kW
CCS2×2
HPC
Price
Vale doesn't publish a price for this point. The current tariff is shown in the network's own app. Vale website
Facility
- Nearby: Parking
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 74 points with known power in Esenler district, it is 12th (150 kW). The nearest other DC point is at the same address: YTÜ Teknopark Yönetim Binası DC 120 KW-22 (Vale, 120 kW). There are 359 more DC points within 10 km. Within 3 km there are 121 other charging points and 34 different networks in total.
The Vale network has 43 points in İstanbul province; this one is among those in the Esenler area.
- Power rank in Esenler
- 12 / 74
- Nearest other DC
- at the same address
- 3 km radius
- 122 points · 34 networks
Charging time here from 10% to 80% (150 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 30 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Vale app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Yıldız Teknopark Yönetim Binası 160 KW DC charging station?
Approximate 10% to 80% times with the 150 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 30 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 150 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Yıldız Teknopark Yönetim Binası 160 KW DC have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 150 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
YTÜ Teknopark Yönetim Binası DC 120 KW-22
0 m · Vale · CCS2
120kW
Yıldız Teknopark Yönetim Binası AC-9
8 m · Vale · Type 2
22kW
Yıldız Teknopark Yönetim Binası AC-12
18 m · Vale · Type 2
22kW
Yıldız Teknik Üniversitesi Davutpaşa Kampüsü Teknopark
46 m · Trugo · Type 2
22kW
Yıldız Teknopark Ağa Lokantası AC_16
152 m · Vale · Type 2
22kW
Yıldız Teknopark C1 BLOK AC-7
196 m · Vale · Type 2
22kW
Source: Electroop + EPDK licence record · Updated: 19 October 2026 at 04:38 · How the data is collected