Yörsan Dinlenme Tesisleri
Trugo · Yörsan Dinlenme Tesisleri
- Max power
- 180kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
With the Trugo app you can also charge at
Eşarj (karşılıklı, komisyonsuz)
Customer service
0850 808 78 46 · 7/24
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 180kW
CCS2×2
HPC14.98 ₺/kWh
Price
- DC
- 14.98 ₺/kWh
Trugo standard tariff; prices may vary by location. Tariff source
Facility
- Located at: Fuel station
- Nearby: Restaurant · Parking
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 29 points with known power in Susurluk district, it is 16th (180 kW). The nearest other DC point is at the same address: TotalEnergies Yörsan Mizey Gıda (Otojet, 150 kW). There are 22 more DC points within 10 km. Within 3 km there are 18 other charging points and 9 different networks in total; you may need different networks' apps.
The DC tariff of 14.98 ₺/kWh is in line with the Balıkesir median (14.98 ₺/kWh). The Trugo network has 51 points in Balıkesir province; this one is among those in the Susurluk area.
- Power rank in Susurluk
- 16 / 29
- Nearest other DC
- at the same address
- 3 km radius
- 19 points · 9 networks
- DC tariff
- 14.98 ₺/kWh
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Trugo app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Yörsan Dinlenme Tesisleri charging station?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Yörsan Dinlenme Tesisleri?
According to the tariff published by the Trugo network, prices at this point are: DC 14.98 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 930 ₺ at the DC tariff. Payment is made with the Trugo app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Yörsan Dinlenme Tesisleri have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
TotalEnergies Yörsan Mizey Gıda
10 m · Otojet · CCS2
150kW
Otojet - Mizey Gıda
31 m · Otojet · CCS2
180kW
Yörsan Dinlenme Tesisi
43 m · ZES · CCS2
400kW
Yasa Dinlenme Tesisleri Susurluk
1.1 km · En Yakıt · CCS2
150kW
Susurluk Yasa Tesisleri
1.1 km · En Yakıt · CCS2
180kW
GIOev - Festiva Outlet Susurluk
1.1 km · Gioev · CCS2
300kW
Source: Trugo + EPDK licence record · Updated: 27 August 2026 at 12:44 · How the data is collected
