Korkuteli PO
Trugo · Akyar Mahallesi Korkuteli / ANTALYA
- Max power
- 180kW
- Connectors
- 2
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
With the Trugo app you can also charge at
Eşarj (karşılıklı, komisyonsuz)
Customer service
0850 808 78 46 · 7/24
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 180kW
CCS2×2
HPC14.98 ₺/kWh
Price
- DC
- 14.98 ₺/kWh
Trugo standard tariff; prices may vary by location. Tariff source
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 180 kW, it ranks 2nd by power among the 9 points with known power in Korkuteli district. The nearest other DC point is 5.9 km away: Korkuteli Petrol Ofisi Akaryakıt İstasyonu (Trugo, 180 kW). There are 3 more DC points within 10 km. The DC tariff of 14.98 ₺/kWh is in line with the Antalya median (14.90 ₺/kWh).
The Trugo network has 50 points in Antalya province; this one is among those in the Korkuteli area.
- Power rank in Korkuteli
- 2 / 9
- Nearest other DC
- 5.9 km
- DC tariff
- 14.98 ₺/kWh
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Trugo app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Korkuteli PO?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Korkuteli PO?
According to the tariff published by the Trugo network, prices at this point are: DC 14.98 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 930 ₺ at the DC tariff. Payment is made with the Trugo app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Korkuteli PO have?
This point has 2 recorded sockets: 2 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Korkuteli Petrol Ofisi Akaryakıt İstasyonu
5.9 km · Trugo · CCS2
180kW
Yasar Yalcın Petrol, Antalya
5.9 km · Eşarj · CCS2
180kW
Aytemiz, Yorgancıoğlu, Antalya
8.4 km · Eşarj · CCS2 · Type 2
120kW
Özel Medi Yaşam Hastanesi
11 km · En Yakıt · CCS2
180kW
TR-07-003 Yeşilyayla
11 km · Şarjplus · Type 2
7.4kW
Korkuteli Şarj İstasyonu
12 km · Petroo · CCS2 · Type 2
180kW
Source: EPDK licence record (ŞRJ/6998) · Updated: 2 November 2026 at 17:35 · How the data is collected
