Gökova Ören Marina

Tripy · Ören Mahallesi Ören Bodrum / MUĞLA

Max power
50kW
Connectors
4
Current
DC / AC

See the spot and its surroundings before you go

Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.

No status notes in the last 3 hours. If you're here, share:

Right now:

Was your charging experience good?

No votes yet. Be the first.

Approximate location: the source coordinates point to the province/district centre. Check the address before you set off; if you know the right spot, report it with “Wrong location”.

See it on the map with nearby points

Connectors

  • CCS2×1

    DC

    50kW
  • CCS2×2

    DC

    30kW
  • Type 2×1

    AC

    22kW

Price

Tripy doesn't publish a price for this point. The current tariff is shown in the network's own app.

Access

Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.

  • Open to the public?

    No information yet

  • Usable 24/7?

    No information yet

  • Is there a parking fee?

    No information yet

This point: location and surroundings

With 50 kW, it ranks 68th by power among the 202 points with known power in Bodrum district. The nearest other DC point is at the same address: Rino's Garden, Muğla (Eşarj, 120 kW). There are 50 more DC points within 10 km. Nearby (3 km): 61 other points and 24 networks; you may need different networks' apps.

Power rank in Bodrum
68 / 202
Nearest other DC
at the same address
3 km radius
62 points · 24 networks

Charging time here from 10% to 80% (50 kW DC)

Togg T10X
≈ 1 h 20 min
Tesla Model Y Long Range
≈ 1 h 10 min
MG4 (64 kWh)
≈ 1 h
BYD Atto 3
≈ 55 min

Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.

How to charge

You start charging with the Tripy app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.

Frequently asked questions

How many minutes does charging take at Gökova Ören Marina?

Approximate 10% to 80% times with the 50 kW DC socket: Togg T10X 1 h 20 min, Tesla Model Y Long Range 1 h 10 min, MG4 (64 kWh) 1 h and BYD Atto 3 55 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 50 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.

Which sockets does Gökova Ören Marina have?

This point has 4 recorded sockets: CCS2 (DC, 50 kW), Type 2 (AC, 22 kW) and 2 × CCS2 (DC, 30 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.

Something wrong?

If you've seen wrong information or a connector that doesn't work, tell us; we'll check and fix it.

Source: EPDK licence record (ŞRJ/7399) · Updated: 2 November 2026 at 17:35 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy