Edirne Hilly Hotel Tesla Supercharge
Tesla · Şükrüpaşa Mahallesi Kıyık Caddesi No:254 Merkez / EDİRNE
- Max power
- 250kW
- Connectors
- 10
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Bekleme ücreti: istasyon %50+ doluyken dakikada 10 ₺, tamamen doluyken 20 ₺; şarj bittikten sonra 5 dk içinde ayrılırsan ücret yok.source
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 250kW
CCS2×10
HPC13.00 ₺/kWh
Price
- HPC
- 13.00 ₺/kWh
Tesla standard tariff; prices may vary by location. Tariff source
Facility
- Located at: Fuel station
- Nearby: Restaurant
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 51 points with known power in Merkez district, it is 3rd (250 kW). The nearest other DC point is 1.6 km away: Shell Edirne Şükrüpaşa (Shell, 120 kW). There are 19 more DC points within 10 km. Within 3 km there are 37 other charging points and 19 different networks in total.
The DC tariff of 13.00 ₺/kWh is 13% below the median of the 39 known DC tariffs in Edirne (14.98 ₺/kWh).
- Power rank in Merkez
- 3 / 51
- Nearest other DC
- 1.6 km
- 3 km radius
- 38 points · 19 networks
- DC tariff
- 13.00 ₺/kWh
Charging time here from 10% to 80% (250 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 20 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Tesla app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Edirne Hilly Hotel Tesla Supercharge charging station?
Approximate 10% to 80% times with the 250 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 20 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 250 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Edirne Hilly Hotel Tesla Supercharge?
According to the tariff published by the Tesla network, prices at this point are: DC 13.00 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 810 ₺ at the DC tariff. Payment is made with the Tesla app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Edirne Hilly Hotel Tesla Supercharge have?
This point has 10 recorded sockets: 10 × CCS2 (HPC, 250 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Edirne 1. Etap Toki Konutları
1.4 km · Voltrun · Type 2
10kW
Shell Edirne Şükrüpaşa
1.6 km · Shell · CCS2
120kW
Otojet - Alibey Petrol
1.6 km · Otojet · CCS2
150kW
TotalEnergies Alibey Petrol
1.7 km · Otojet · CCS2
150kW
Erasta AVM Edirne
1.7 km · ZES · Type 2
22kW
Edirne Ticaret ve Sanayi Odası
1.8 km · ZES · Type 2
22kW
Source: EPDK licence record (ŞRJ/3014) · Updated: 2 November 2026 at 17:35 · How the data is collected
