Seyrinar Sitesi
Sunlight · Atatürk Mahallesi Erdal İnönü Caddesi No:25/A Narlıdere / İZMİR
- Max power
- 11kW
- Connectors
- 2
- Current
- AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 11kW
Type 2×2
AC
Price
Sunlight doesn't publish a price for this point. The current tariff is shown in the network's own app.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
At 11 kW, it is in the slow-charging group among the 16 points with known power in Narlıdere district; for a quick stop, the nearest DC point below is the better choice. This point offers AC (slow) charging; the nearest DC fast charger is 1.5 km away: Yapınet Yapı Market (OtoWATT, 180 kW). Nearby (3 km): 23 other points and 12 networks; you may need different networks' apps.
The Sunlight network has 7 points in İzmir province; this one is among those in the Narlıdere area.
- Power rank in Narlıdere
- 12 / 16
- Nearest DC
- 1.5 km
- 3 km radius
- 24 points · 12 networks
Charging time here from 20% to 80% (AC up to 11 kW)
- Togg T10X
- ≈ 5.5 hours
- Tesla Model Y Long Range
- ≈ 4.5 hours
- MG4 (64 kWh)
- ≈ 4 hours
- BYD Atto 3
- ≈ 3.5 hours
AC charging suits long stays (work, shopping centre, overnight). Calculated assuming the vehicle accepts AC up to 11 kW; the value is approximate.
How to charge
You start charging with the Sunlight app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many hours does charging take at Seyrinar Sitesi?
This point provides 11 kW AC charging; if your car accepts up to 11 kW AC, approximate 20% to 80% times are: Togg T10X 5.5 hours, Tesla Model Y Long Range 4.5 hours, MG4 (64 kWh) 4 hours and BYD Atto 3 3.5 hours. AC charging suits long stays such as work, shopping or overnight; for a quick stop on the road, check the nearest DC fast charging point on this page. Values are estimates.
Which sockets does Seyrinar Sitesi have?
This point has 2 recorded sockets: 2 × Type 2 (AC, 11 kW). There is no DC fast charging; the point provides AC charging. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Onag Narlıdere Sitesi
293 m · Voltrun · Type 2
21kW
Mavi SU Evleri
459 m · Voltrun · Type 2
10kW
Vitalia Narlıdere İzmir
537 m · ZES · Type 2
22kW
Esenpark Sitesi - C Blok
874 m · Green Science · Type 2
7kW
Esenpark Sitesi - D Blok
877 m · Green Science · Type 2
7kW
Esenpark Sitesi - A Blok
879 m · Green Science · Type 2
7kW
Source: EPDK licence record (ŞRJ/11664) · Updated: 2 November 2026 at 17:35 · How the data is collected