Spectrum-1
Spectrum Girişimcilik · İstasyon Mahallesi Uşak Caddesi - Sokağı No:177 /- - - Sandıklı / AFYONKARAHİSAR
- Max power
- 50kW
- Connectors
- 37
- Current
- AC / DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Approximate location: the source coordinates point to the province/district centre. Check the address before you set off; if you know the right spot, report it with “Wrong location”.
See it on the map with nearby pointsConnectors
- 50kW
CCS2×1
DC
- 5kW
Type 2×36
AC
Price
Spectrum Girişimcilik doesn't publish a price for this point. The current tariff is shown in the network's own app.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 50 kW, it ranks 49th by power among the 87 points with known power in Merkez district. The nearest other DC point is 250 m away: Adalya Dinlenme Tesisleri (ZES, 180 kW). There are 6 more DC points within 10 km. Nearby (3 km): 12 other points and 6 networks; you may need different networks' apps.
The Spectrum Girişimcilik network has 2 points in Afyonkarahisar province; this one is among those in the Afyonkarahisar area.
- Power rank in Merkez
- 49 / 87
- Nearest other DC
- 250 m
- 3 km radius
- 13 points · 6 networks
Charging time here from 10% to 80% (50 kW DC)
- Togg T10X
- ≈ 1 h 20 min
- Tesla Model Y Long Range
- ≈ 1 h 10 min
- MG4 (64 kWh)
- ≈ 1 h
- BYD Atto 3
- ≈ 55 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Spectrum Girişimcilik app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Spectrum-1?
Approximate 10% to 80% times with the 50 kW DC socket: Togg T10X 1 h 20 min, Tesla Model Y Long Range 1 h 10 min, MG4 (64 kWh) 1 h and BYD Atto 3 55 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 50 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Spectrum-1 have?
This point has 37 recorded sockets: 36 × Type 2 (AC, 5 kW) and CCS2 (DC, 50 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Source: EPDK licence record (ŞRJ/14304) · Updated: 2 November 2026 at 17:35 · How the data is collected