Orjin Plaza
Solarşarj · Maslak Mahallesi Eski Büyükdere Caddesi Sarıyer / İSTANBUL
- Max power
- 60kW
- Connectors
- 8
- Current
- AC / DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
İşlem bittikten sonra 15 dk tolerans, sonra dakikada 10 ₺.source
With the Solarşarj app you can also charge at
ZES (iki uygulamadan da başlatılabilir)
Customer service
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 60kW
CCS2×2
DC
- 22kW
Type 2×6
AC
Price
Solarşarj doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Nearby: Parking
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 60 kW, it ranks 59th by power among the 181 points with known power in Sarıyer district. The nearest other DC point is 300 m away: Şekerkule DC (Carbonage, 60 kW). There are 347 more DC points within 10 km. Nearby (3 km): 272 other points and 56 networks; if one is busy, an alternative is easy to find nearby.
The Solarşarj network has 41 points in İstanbul province; this one is among those in the Sarıyer area.
- Power rank in Sarıyer
- 59 / 181
- Nearest other DC
- 300 m
- 3 km radius
- 273 points · 56 networks
Charging time here from 10% to 80% (60 kW DC)
- Togg T10X
- ≈ 1 h 5 min
- Tesla Model Y Long Range
- ≈ 55 min
- MG4 (64 kWh)
- ≈ 50 min
- BYD Atto 3
- ≈ 45 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Solarşarj app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at Orjin Plaza?
Approximate 10% to 80% times with the 60 kW DC socket: Togg T10X 1 h 5 min, Tesla Model Y Long Range 55 min, MG4 (64 kWh) 50 min and BYD Atto 3 45 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 60 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Orjin Plaza have?
This point has 8 recorded sockets: 6 × Type 2 (AC, 22 kW) and 2 × CCS2 (DC, 60 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Source: EPDK licence record (ŞRJ/4535) · Updated: 2 November 2026 at 17:35 · How the data is collected
