Sakarya 1 – Ülker Kardeşler

Solargize · Kozluk Mahallesi Kozluk Caddesi No:31 Erenler / SAKARYA

Max power
100kW
Connectors
2
Current
DC

See the spot and its surroundings before you go

Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.

No status notes in the last 3 hours. If you're here, share:

Right now:

Was your charging experience good?

No votes yet. Be the first.

See it on the map with nearby points

Connectors

  • CCS2×2

    DC

    100kW

Price

Solargize doesn't publish a price for this point. The current tariff is shown in the network's own app.

Access

Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.

  • Open to the public?

    No information yet

  • Usable 24/7?

    No information yet

  • Is there a parking fee?

    No information yet

This point: location and surroundings

In the power ranking among the 32 points with known power in Erenler district, it is 17th (100 kW). The nearest other DC point is 800 m away: Opet Atl Petrol Erenler (WAT Mobilite, 120 kW). There are 59 more DC points within 10 km. Within 3 km there are 18 other charging points and 16 different networks in total.

Power rank in Erenler
17 / 32
Nearest other DC
800 m
3 km radius
19 points · 16 networks

Charging time here from 10% to 80% (100 kW DC)

Togg T10X
≈ 45 min
Tesla Model Y Long Range
≈ 40 min
MG4 (64 kWh)
≈ 35 min
BYD Atto 3
≈ 35 min

Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.

How to charge

You start charging with the Solargize app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.

Frequently asked questions

How long does charging from 10% to 80% take at the Sakarya 1 – Ülker Kardeşler charging station?

Approximate 10% to 80% times with the 100 kW DC socket: Togg T10X 45 min, Tesla Model Y Long Range 40 min, MG4 (64 kWh) 35 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 100 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.

Which sockets does Sakarya 1 – Ülker Kardeşler have?

This point has 2 recorded sockets: 2 × CCS2 (DC, 100 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.

Other points nearby

straight-line

Something wrong?

If you've seen wrong information or a connector that doesn't work, tell us; we'll check and fix it.

Source: EPDK licence record (ŞRJ/13187) · Updated: 2 November 2026 at 17:35 · How the data is collected

We'd like to use cookies for visit statistics (Google Analytics) and Google ads, but only if you allow it. Your location and identity are never shared. Cookie Policy