İSTANBUL 3 – Perpa Açık Otopark
Solargize · H. Rıfat Paşa Mahallesi Darülaceze Caddesi No:Perpa Otopark Şişli / İSTANBUL
- Max power
- 120kW
- Connectors
- 3
- Current
- DC / AC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 120kW
CCS2×2
DC
- 22kW
Type 2×1
AC
Price
Solargize doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Located at: Fuel station
- Nearby: Parking
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
With 120 kW, it ranks 12th by power among the 112 points with known power in Şişli district. The nearest other DC point is 200 m away: Önizşarj Perpa Ticaret Merkezi (Önizşarj, 120 kW). There are 411 more DC points within 10 km. Nearby (3 km): 192 other points and 51 networks; you may need different networks' apps.
The Solargize network has 7 points in İstanbul province; this one is among those in the Şişli area.
- Power rank in Şişli
- 12 / 112
- Nearest other DC
- 200 m
- 3 km radius
- 193 points · 51 networks
Charging time here from 10% to 80% (120 kW DC)
- Togg T10X
- ≈ 40 min
- Tesla Model Y Long Range
- ≈ 35 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Solargize app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How many minutes does charging take at İSTANBUL 3 – Perpa Açık Otopark?
Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does İSTANBUL 3 – Perpa Açık Otopark have?
This point has 3 recorded sockets: 2 × CCS2 (DC, 120 kW) and Type 2 (AC, 22 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Önizşarj Perpa Ticaret Merkezi
217 m · Önizşarj · CCS2 · Type 2
120kW
Perpa İŞ Merkezi
467 m · Trugo · Type 2
22kW
Perpa Açık Otopark Şarj İstasyonu
493 m · Ecoconnect · Type 2 · CCS2
120kW
Perpa Açık Otopark Şarj İstasyonu
493 m · Türkşarj · Type 2 · CCS2
120kW
Kolan Hastanesi Şişli
583 m · Pilstop · Type 2
22kW
Imperium No 1 Residence AC
751 m · Pluginn · Type 2
22kW
Source: EPDK licence record (ŞRJ/9500) · Updated: 21 August 2026 at 23:51 · How the data is collected