Ankara 6 - Duruaylar İnşaat
Solargize · Oyaca Akarsu Mah Mahallesi Şehit Mükremin Başaran Cad. Caddesi No:136 Gölbaşı / ANKARA
- Max power
- 120kW
- Connectors
- 2
- Current
- DC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Connectors
- 120kW
CCS2×2
DC
Price
Solargize doesn't publish a price for this point. The current tariff is shown in the network's own app.
Facility
- Nearby: Café
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 132 points with known power in Gölbaşı district, it is 29th (120 kW). The nearest other DC point is 17 km away: ERG Gökçehöyük OHT Niğde Yönü DC-1, DC-2 (Beefull, 180 kW). There is no other DC point within 10 km. The Solargize network has 6 points in Ankara province; this one is among those in the Gölbaşı area.
- Power rank in Gölbaşı
- 29 / 132
- Nearest other DC
- 17 km
Charging time here from 10% to 80% (120 kW DC)
- Togg T10X
- ≈ 40 min
- Tesla Model Y Long Range
- ≈ 35 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Solargize app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Ankara 6 - Duruaylar İnşaat charging station?
Approximate 10% to 80% times with the 120 kW DC socket: Togg T10X 40 min, Tesla Model Y Long Range 35 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 120 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
Which sockets does Ankara 6 - Duruaylar İnşaat have?
This point has 2 recorded sockets: 2 × CCS2 (DC, 120 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Oyaca Konut
181 m · Sky World Solar Enerji
Haymana Devlet Hastanesi
14 km · Trugo · Type 2
22kW
Armada Grannos Thermal Hotel Ankara
15 km · ZES · Type 2
22kW
Bonjour Hotel
15 km · ZES · Type 2
22kW
ERG Gökçehöyük OHT Niğde Yönü DC-1, DC-2
17 km · Beefull · CCS2
180kW
ERG-Gökçehöyük (10.Km) | Ankara | Aksaray Yönü
18 km · Trugo · CCS2
180kW
Source: EPDK licence record (ŞRJ/11570) · Updated: 2 November 2026 at 17:35 · How the data is collected