Shell Sapanca OHT Güney
Shell · Acısu Mahallesi Sapanca Yolu Caddesi Koru Sokağı No:38 Tepetarla Kınalı Sakarya Otoyolu Kartepe / KOCAELİ
- Max power
- 180kW
- Connectors
- 10
- Current
- HPC
See the spot and its surroundings before you go
Is it well lit and busy, where is the entrance? Check with Street View; if you don't feel comfortable, pick another station.
No status notes in the last 3 hours. If you're here, share:
Was your charging experience good?
No votes yet. Be the first.
Idle (blocking) fee after charging
Not stated officially; check the network's app.
Compiled from the network's official pages (22/10/2026). Fees may change; check the app before charging.
Connectors
- 180kW
CCS2×10
HPC15.99 ₺/kWh
Price
- HPC
- 15.99 ₺/kWh
Shell standard tariff; prices may vary by location. Tariff source
Facility
- Located at: Rest area
- According to OpenStreetMap, within about 150 m of the station (300 m on a service area); things may have changed on site. Data © OpenStreetMap contributors, ODbL.
Access
Based on drivers' answers over the last 6 months. Answer if you know; who you are is not recorded.
Open to the public?
No information yet
Usable 24/7?
No information yet
Is there a parking fee?
No information yet
This point: location and surroundings
In the power ranking among the 37 points with known power in Kartepe district, it is 3rd (180 kW). The nearest other DC point is 600 m away: Shell Sapanca OHT Kuzey (Shell, 180 kW). There are 38 more DC points within 10 km. Within 3 km there are 10 other charging points and 8 different networks in total; you may need different networks' apps.
The DC tariff of 15.99 ₺/kWh is 7% above the median of the 119 known DC tariffs in Kocaeli (14.90 ₺/kWh). The Shell network has 4 points in Kocaeli province; this one is among those in the Kartepe area.
- Power rank in Kartepe
- 3 / 37
- Nearest other DC
- 600 m
- 3 km radius
- 11 points · 8 networks
- DC tariff
- 15.99 ₺/kWh
Charging time here from 10% to 80% (180 kW DC)
- Togg T10X
- ≈ 35 min
- Tesla Model Y Long Range
- ≈ 25 min
- MG4 (64 kWh)
- ≈ 30 min
- BYD Atto 3
- ≈ 35 min
Approximate value: calculated from battery capacity, the manufacturer's peak DC power and an average charging-speed factor. Actual time varies with air temperature, the battery's state of charge and the number of vehicles charging at the same time.
How to charge
You start charging with the Shell app or card, and you pay there too. Şarj Rehberim only helps you find the point; it doesn't sell charging.
Frequently asked questions
How long does charging from 10% to 80% take at the Shell Sapanca OHT Güney charging station?
Approximate 10% to 80% times with the 180 kW DC socket: Togg T10X 35 min, Tesla Model Y Long Range 25 min, MG4 (64 kWh) 30 min and BYD Atto 3 35 min. The time depends on the maximum DC power your car accepts; a car with a DC peak power below 180 kW charges here at its own peak power. Values are estimates based on battery capacity and average charging speed; cold weather and other cars charging at the same time make it take longer.
How much does charging cost at Shell Sapanca OHT Güney?
According to the tariff published by the Shell network, prices at this point are: DC 15.99 ₺/kWh. Example: charging a Togg T10X from 10% to 80% takes about 62 kWh and costs about 990 ₺ at the DC tariff. Payment is made with the Shell app or card; any idle or parking fee is shown in the network's app, and tariffs may change.
Which sockets does Shell Sapanca OHT Güney have?
This point has 10 recorded sockets: 10 × CCS2 (HPC, 180 kW). As it offers DC fast charging, the point is suitable for a short stop on a long trip. Most electric cars sold in Türkiye charge via Type 2 on AC and CCS2 on DC; match your car's socket with the "Fits My Vehicle" filter on the map.
Other points nearby
Shell Sapanca OHT Kuzey
588 m · Shell · CCS2
180kW
Shell Sapanca OHT İstanbul Yönü
588 m · Trugo
Shell Sapanca OHT Ankara Yönü
588 m · Trugo
Ögel Kardesler Otomotiv
2.1 km · Elaris Elektrikli Araç Şarj Hizmetleri · CCS2 · Type 2
120kW
Özdilek Kocaeli AVM
2.4 km · Sharz · Type 2
22kW
Özdilek Kocaeli AVM
2.4 km · ZES · CCS2
180kW
Source: EPDK licence record (ŞRJ/8272) · Updated: 2 November 2026 at 17:35 · How the data is collected
